Laserfiche WebLink
A summary of the topsoil stockpile azeas is given below: <br />• <br />1. Stockpile #1: Main Stockpile located north of County Road containing 5,900 cy from the initial <br />stripping of Area 2 plus 1,300 cy from Area 1 for a total estimated volume of 7,200 cy. The <br />stockpile azea shown on Map C-2 is lazger than necessary to store 7,200 cy, so there is extra <br />storage space available in case the average stripping depth is greater. <br />2. Stockpile #2: Located at Watet Treatment Area with an estimated volume of 4,200 cy. <br />3. Stockpile #3: Located at Whirlwind portal bench with an estimated volume of 3,900 cy. <br />Total estimated topsoil storage required: 15,300 cy <br />Temporary topsoil stockpiles will be created in front (i.e., east) of the waste rock pile as it expands. <br />This material will be used to concurrently reclaim the north facing waste rock pile slopes next to <br />County Road 5/10 after they are regraded to a 3H:1 V configuration. <br />• Each topsoil stockpile will have a small, one-foot high berm along the perimeter to isolate it from <br />the surrounding azea runoff and to trap runoff from the stockpile itself within the ditch created by <br />the berm. All stockpiles that will be in place for more than one yeaz will be seeded using the <br />prescribed mix shown in the Reclamation Plan. <br />Pond Excavation <br />After topsoil is removed to an average depth of 16 inches over the water treatment and sediment <br />pond azea, the ponds will be excavated. Some of the excavated material will be used to build up the <br />treatment azea to a nominal elevation of 7,050 feet and to construct a 1.5-foot high berm with <br />2H:1 V side slopes azound each of the lined ponds. These berms will prevent runoff from entering <br />the treatment system. The remaining volume of subsoil will be in a stockpile located east of the <br />ponds as shown on Map C-2.. The estimated volume of subsoil removed and stockpiled from the <br />ponds is summarized below: <br />~~ <br />Whirlwind Mine June 07 D-17 <br />