Laserfiche WebLink
4. Surface and Underground Mine Equipment <br />The following equipment maybe used at the mine operation. <br />TABLE D-2 <br />PRELIMINARY MINE EQUIPMENT LIST <br /> <br />i~ <br />Under <br />und E <br />ui <br />ment <br />r <br />g <br />o <br />q <br />p Number <br />Diesel Skid-Steer Loaders, 2 c ca aci 2 - 3 <br />Diesel Trucks (Bug 'es), 5 and 10 ton capacity 8 -10 <br />Develo ment Drill, Jumbo 1 <br />Production Drills, Jackle s 8 -10 <br />Ex loration Drills, Longhole 1 - 2 <br />Diesel Boss Buggies and Utility Vehicles 2 - 4 <br />Surf <br />e E <br />ui <br />nt ~`1 <br />q <br />pme <br />ac Number <br /> <br />Front End Loader, 2 - 3 cy ca aci 1 <br />Backhoe/Skid Loader or Excavator, 80-h s 1 <br />Hi way Haul Trucks, 22 to 24-ton ca aci 2 - 8 <br />Bulldozer, 200-hp 1 <br />Motor Grader, 140-h 1 <br />Flat-Bed Truck, 1-ton 1 <br />Pick-u Truck, '/e-ton (4wd) 2 <br />Notes: <br />(a) A backhoe and/or hydraulic excavator will be brought on site as needed to perform <br />maintenance activities. <br />(b) Highway haul trucks will be provided by a contractor. Trucks used for transportation will <br />consist of 14-ton, end-dump trucks with 10-ton pups pulled behind or 23-ton end or side dump <br />haul trucks. The number of trucks listed is based on two trips per day. <br />(c) Miscellaneous rental and contract equipment will be brought to the mine site as needed. These <br />could include fuel trucks, propane trucks, boom trucks, maintenance vehicles including <br />welders, pipe equipment, electrical man lifts for working on power lines, contract vent hole <br />drilling equipment, exploration drilling equipment, material delivery trucks, and concrete and <br />gravel trucks. <br />Whirlwind Mine June 07 D-9 <br />