My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE44073
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE44073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:32 PM
Creation date
11/20/2007 11:48:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Permit File
Doc Date
7/2/2007
Doc Name
New Application
From
Energy Fuels Resources Corporation
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-iii- <br />Compliance with Other Laws: <br />Compliance with the Ac[ and Rules and Regulations of the Mined Land Reclamation Board does not in any way relieve you of the responsibility to <br />cottrply with all other applicable state and federal taws (Section 34-32-115(4)(c) and 109(5), C.R.S. 1984, as arrmnded). At a minimum, you MUST <br />contact the following agencies to detemrine whether or not you need to comply with theu legal requirements: <br />• The Colorado Historical Soeiery regarding properties of historical sigrtificance including the need for an azcheological survey, <br />procedures for requestipg a file search, and inventory forms to identify structures; <br />• Colorado Division of Water Resources with regard to the administration of water rights; <br />• Colorado Department of Health, Water Quality Control Di~~sion, with regard to the discharge ofpollutants into the waters of the <br />Slate; <br />• Colorado Department of Health, Air Pollution Control Division, with regard to the need for a fugitive dust permit; <br />• U.S. Bureau of Land Management or the U.S. Forest Service for proposed operntions on federal lands; <br />• U.S. Amty Corps of Engineers regazding a dredge and fill (404) permit; and <br />• The County Planning Department for the county or counties in which the proposed operation is located. (Section 34-32-[09(6), <br />C.R.S. 1984, as amended) requires a mining operator to be responsible for assuring that the mining operation and the post-mining <br />land use comply with local land use regulations and any master plan for extraction adopted pursuant [o Section 34-1-304.) <br />Permit Approval <br />An applicant wilt not be issued a reclamation permit until notified by the Office that this application and the required performance and financial <br />warranties have been approved. Alternatively, an automatic approval will occur where the Office fails to notify the applicanUoperator that the <br />application has been denied. This decision must be made one hundred twenty (120) calendar days from the date the application was submitted. <br />However, the performance and financial warranties must be submitted and approved by the Office before the permit will be issued even if you <br />receive an automatic approval NO MINING OPERATIONS SHALL BEGIN UNTIL A PERMIT IS ISSUED (Rule 4,1(2)). <br />Notice Requirements: <br />Within ten (10} days after filing, rnail or personally serve a copy ofthe notice described in Rule t.6.2(1)(c) to all owners ofrecord ofsurface rights <br />to the affected land and all owners of record of lands that are within 200 feet of the boundary of the affected land (Rule 1.6.2(1)(d)(I) and (ii)). In <br />additioq you must publish four consecutive tithes in a newspaper of general circulation, in the locality of the proposed mining operation, the notice <br />described in Rule 1.6.5. A copy of a form which includes all required information for the notice has been attached for your use. You will need to <br />provide the Office proof of notice prior to the decision date. Proofofno[icemaybebysubmittingrettunreceiptsofaceRifiedmailingorbyproof <br />of personal service (Rules 1.4. ] (4), 1.4.2(4)(c) and 1.6.2(1)(d)). <br />OTF. TO COMMENTORS/OBJECTORS <br />It is likely there will be additions, changes, and deletions to this document prior to final decision by the Office. Therefore, if you have any <br />comments or concerns you must contact the applicant or the Office prior [o the decision date so that you witl know what changes may have been <br />made to the application document. <br />The Office is not allowed to consider comments, unless they are written, and received prior to the end of the public comment period. You should <br />contact the applicant for the final date of the public comment period. <br />Ifyou have questions about the Mined Land Reclamation Board and Office's reviewand decision or appeals process, you may contact the Office at <br />(303)866-3567. <br />Completion oFMinine: <br />Upun complefion of aay phase of reclamatioq you should consult Rule 3.1 for reclamation standards and 4.16 for details on horv to request a <br />reclaration respoasibitity release From the Board. <br />DMO 1 I Zd.APP(eN30l1003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.