Laserfiche WebLink
<br />REFERENCES <br />Abel, J. F., Jr., 1982, Analysis of Pillar Failure 2nd and 3rd East Panels <br />Roadside Mine, 20 p. <br />Abel, J. F., Jr., 1982, Surface Subsidence Fonitoring Guidelines, Phase I <br />Report-USGS Contract No. 14-08-001-18822, 11 p. <br />Abel, J. F., Jr. and Lee, F. T., 1980, Lithologic controls on subsidence: <br />SME/AIME Preprint No. 80-314, 16 p. <br />Abel, J. F., Jr. and Gentry, D. W., 1978, A longwall subsidence prediction <br />model; in Coal mine subsidence: ASCE National Convention, session 71, <br />Preprint Na. 3293, p. 56-76. <br />Goddard, W. R., Administrator for Town of Palisade, 1982, Personal Communication <br />re: Specifics of construction, use, monitoring, and repair of water <br />supply pipelines located within the Powderhorn Coal Company permit area. <br />Vickstrom, H. 0., 1982, Plant Manager for Ute Water Conservancy District, <br />• Personal Communication re: construction, monitoring, and repair of <br />raw water supply pipeline located within the Powderhorn Coal Company <br />permit area. <br />• <br />