My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43993
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:28 PM
Creation date
11/20/2007 11:46:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/11/2004
Section_Exhibit Name
2.05 Operation and Reclamation Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 2.05.6 <br />August of each year a sample will be obtained and analyzed for the <br />parameters on List 2. <br />Stephens Draw will be monitored quarterly at the designated upstream and <br />downstream monitoring locations shown on Map 9. Field parameters will be <br />measured each quarter. A full suite sample from List 1 will be obtained semi- <br />annually during the second and fourth quarters. <br />Gulches A, B, C, & D will be monitored quarterly at the designated upstream <br />and downstream monitoring locations shown on Map 9 except A-Gulch does <br />not have an upstream monitoring point. Field parameters will be measured <br />each quarter. A full suite sample from List 1 will be obtained semi-annually <br />during the second and fourth quarters. <br />Alluvial wells 1 through 9, 11, 12 and 14 through 17 will be monitored <br />quarterly for field parameters. A full suite sample will be obtained semi- <br />. annually during the second and fourth quarters. <br />Culverts 1 through 4 will be monitored quarterly for field parameters. A full <br />suite sample from List 1 will be obtained semi-annually during the second <br />and fourth quarters. <br />The sediment ponds will be monitored in accordance with discharge permit <br />requirements. During August of each year a sample will be obtained and <br />analyzed for the parameters on List 2 if the sediment ponds discharge. <br />Mine inflows will be measured annually for field parameters. An annual full <br />suite analysis will be obtained for any point source of inflow greater than 5 <br />gallons per minute. Results of the mine inflow monitoring will be submitted <br />with the annual hydrologic report. <br />The following pages list the water monitoring stations. <br />i• <br />MR-30 <br />2.05 - 78 - <br />9/03 <br />f~ PPRoV F.D <br />lo~~ ~03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.