Laserfiche WebLink
<br />PROJECT IDENTIFICATION <br />Date : 26-Feb-2003 <br />User : JRS <br />CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />Permit or job no.: C-92-081 <br />Abbreviation : none <br />Filename : C08i-000 <br />Colorado Division Of Minerals And Geology <br />Permit Renewal 02 <br />Agency or organization name <br />Permit or job action <br />i <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />OOa -BackfiNing and Rough Grading Tasks -Tasks 001-003 summary2 1 495. _$81,297 <br />OOb -Ripping Tasks -Tasks 006.008 summary2 1 26.3 _ _ $4,80_5 <br />OOc -Road Reclamation Tasks -Tasks 011 and 012 summary2 1 25.3 $4,167 <br />_ <br />DOd -Finish Grading Task -Task 015 summary2 1 8T.1 _ <br />_ <br />$8,158 <br />OOe -Drainage Control System Removal Tasks -Tasks 018-021 summary2 1 49.3 __ $8,70_8 <br />00/ -Topsoil Replacement Tasks -Tasks 024 and 025 summary2 1 234.7 _ <br />$82_,49_0 <br />~ <br />OOg -Borehole Sealing Task -Task 028 summary2 7 9.0 _ $1,341 <br />OOh -Revegetation Tasks -Tasks 031-034 summary2 1 209.0 $76,371 <br />OOi -Demolition Task -Task 037 summary2 1 250.0 _ <br />_$470,237 <br />OOj -Miscellaneous Reclamation Tasks -Tasks 040 and 041 summary2 5 t29.1 __. $_10,016 <br />OOk -Mobilize/Demobilize Equipment Tasks -Tasks 045-047 summary2 7 24.0 _ $15, f89 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />- suaTOraLS: 1,533.1 $762,179 <br />'includes inflation (actor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />NA °/ <br />Liability insurance <br />Pedormance bond <br />Job superintendent <br />Profit <br />Site :Hayden Gulch Loadout <br />State :Colorado _ <br />County : Rout( <br />TOTAL DIRECT COST' _~ $762,179 <br />1.55 °6 of direct total = $11,814 <br />1.05 % of direct total = _ <br />$8,003 <br />766.59 hrs'...$/hr: $35.00 _ <br />total = _ <br />$26,830 <br />10.00 % of direct total = _ <br />$76,218 <br />'assume net hours = 50°e o/task hours <br />LEGAL -ENGINEERING -PROJECT MANAGEMENT - <br />Financial warranty processing (legallrelated casts) <br />Engineering work and/or contracUbid preparafion <br />Reclamation management and/or administration <br />CONTINGENCY - <br />TOTAL 0 8 P = <br />CONTRACT AMOUNT(tlirect+08 P)= $885,044 <br />NA NA NA total = _$0 <br />4.25 % of Intr. NA Total = _ <br />$37,614 <br />6.00 °5 of Intr. NA total = $53,103 <br />NA' NA total = NA <br /> <br />Y <br />I~ <br />T <br />2 <br />i <br />'III. <br />-i <br />contingencies accounted for al Task level TOTAL INDIRECT COST=_ $213,582 <br />TOTAL BOND AMOUNT (direct+indirect) _ , 5975,761 <br />