Laserfiche WebLink
One monument will be monitored on asemi-annual basis, as follows: <br />• Newlin Creek Streambed (1 monument) <br />Monitoring of the above monuments and structures will occur during quarterly and <br />semi-annual periods, during calendar quarters. Monitoring results for both monitoring <br />periods will be submitted on asemi-annual basis within 45 days following the first half <br />(June 30) and last half (December 31) of the year. The locations of all subsidence <br />monuments are shown on the Mine Plan Map, (Map 17). <br />• <br />• <br />2.05.6-60a Revised 2!23/96 <br />Technical Revision No. 24 <br />