My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43835
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:18 PM
Creation date
11/20/2007 11:43:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000099
IBM Index Class Name
Permit File
Doc Date
10/17/2000
Doc Name
FN M-2000-099 PIT 1 110C DECISION LETTER FINANCIAL PERFORMANCE WARRANTY REQUEST CONSTRUCTION
From
DMG
To
MARILYN E VASQUEZ BRUCE A DIAMOND
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />°'.. <br />ROJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task a : 002 State : Coloratlo Permil/ob N : M-2000-099 <br />Dale: 10/16/2000 County:ChaHee Abbreviation none <br />User: JO1 Site:Ptl N7 Filename :M099-002 <br />Permit or other job action : Final Reclamation <br />Task description :Rip P/f FI00! <br />OURLY EQUIPMENT COST Basic machine:Cat D7H Series2(]996) Horsepower: 215 <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab Shifl basis : I per day <br />Attachment no. 2 :3~shank ripper <br />Utilization % Cost data source : (CRGJ <br />Cost Breakdown ~ Ownership cosr/hour : $35.89 NA <br />Operating cost/hour: ¢12.10 100 <br />Ripper op. cosVhour: $5.83 100 <br />Operator cosUhour: $23.72 NA <br />Total unit cosdhour: 8106.93 Total fleet cosVhr: §706.93 <br />Seismic <br />melhotl: NA NA Loatl lector: <br />Area <br />method : 6.50 Acres Rip tlepth (h): <br />Source of quantity take-oX :calculation <br />Source of material load lector: NA <br />HOURLY PRODUCTION <br />Seismic method : Material seismic velocity : NA feet per second <br /> Unadjusted hourly protluction : NA BCV or CCY/hr <br />Area method : Average npping tlepth per pass : 1.00 teal <br /> Average ripping width per pass: 6.50 feel <br /> Aversge npping length per pass : 250.00 leel <br /> Average velocity of machine : 68.00 feet per minute <br /> Average machine maneuver lime/pass: 025 minutes <br /> Hourly protluction per unit area : 0.724 acres per hour <br /> Unadjusted hcurty production : 1,168.30 BCY or CCV/hr <br />Coneciion lectors : Unatllusted hcurty production : 1,168.30 BCY or CCV/hr <br /> Site altitude: 7.820 feet <br /> Altitude adlustment: 0.93 (Cal RB) <br /> Job eXicientyfaclor: 0.63 (1 shitUday) <br /> NeI lob conanion : 0.77 multiplier <br /> Adlusled hourly unit production : 901 81 BCV or CCV/hr <br /> Adjusted hourly 119et production : 901.81 BCV or CCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : <br />1 Dozers) <br />Total7oD hme <br />: 11.63 Hours <br />Unit cost: $0.119 /LCV Total job cost: §1,243 <br />Selected estimating method : Alga <br />NA Bank volume: NA BCV <br />1.0o volume: 10,487 Bcvorccv <br />
The URL can be used to link to this page
Your browser does not support the video tag.