My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43804
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43804
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:17 PM
Creation date
11/20/2007 11:42:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m2004044
IBM Index Class Name
Permit File
Doc Date
11/22/2004
Doc Name
Adequacy Review Response
From
Tetra Tech RMC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Project Description <br />Background: <br />Aggregate Industries-WCR, Ina (Aggregate) is proposing a sand and gravel mining <br />operation in the Northeast '/< and South %Z of Section 1 and the Northwest '/4 of Section <br />12, Township 1 South, Range 67W, 6`h Principal Meridian, Adams County, Colorado. <br />The proposed mine known as Tucson South Resource, is more specifically located on the <br />northwest, northeast and south side of the intersection of Tucson Street and State <br />Highway 7 just west of the city of Brighton. It encompasses several parcels totaling <br />approximately 290.7 acres. The site is currently used primarily for agriculture. There are <br />also several existing residences located within the permit boundary. <br />Proposed Project: <br />It is anticipated that mining at this site will begin in 2005. The proposed life of the mine <br />is 12-18 years, depending on market conditions. There are no concrete or asphalt batch <br />plants planned for this site. <br />Mining: The site will be mined in three (3) Phases. The mining sequence will begin in <br />Phase 1, located on the south side of State Highway 7, continue to Phase 2 on the east <br />side of Tucson Street, and finally Phase 3 on the west side of Tucson Street. Resource <br />material mined under this permit will be processed at the existing Tucson (North) <br />Resource Pit (MLRB Permit M-1991-140), or at the Processing Area located within <br />Phase 3. The Processing Area will contain the scale, scale house, processing equipment, <br />conveyors, raw and finished material stockpiles, and wash ponds. Phase 1 will be wet <br />mined, used for a silt pond, and included with the processing area for the life of the mine. <br />All other mining areas will be dewatered and mined dry. <br />Reclamation: Aggregate proposes to reclaim the property as lined water storage <br />reservoirs. The remaining areas are to be filled and reclaimed as upland or wet meadow. <br />Phase 1 and Phase 2A will be filled with silts and reclaimed as upland or wet meadow. <br />Phase 2 and 3 will be lined water storage reservoirs created by concurrent reclamation. <br />The area west of the Brighton Ditch will be filled and reclaimed as upland area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.