Laserfiche WebLink
<br />EXHIBIT "G"-- WATER IN]?ORMATION <br />Only minimal water for dust control at the crusher is anticipated for this <br />project, The proposed plan calls for recycling ground water exposed from <br />[he numerous ponds along the apparent flood-plain to the crushing plant, <br />Any run-off will be channeled to a settling pond; however, as we anticipate <br />using only 60 to 70 F=illons oer hour, no run-off is expected as the moisture <br />will be carried with the crushed rock over conveyers to the stock Wile, <br />An alternative plan will be the trucking of water into [he area for [his <br />purpose, <br />The S,'ater Quality Control Division of Health at the Colorado Department of <br />Health has advised that no permit will be required for this project, <br />