Laserfiche WebLink
<br />-2- <br />5. Reclamation Plan <br />A. 1'Ihen will reclamation start? <br />B. lYill you stay 200 feet aiaay from the power line? <br />C. 1Vhy is only 6 inches of topsoil replaced? I recommend <br />9 inches of topsoil be replaced. ' <br />D. How many acres will be reclaimed Der year? <br />E. How do you know that there will be no standing water in <br />the pit and how do you plan to alleviate the problem? <br />F. Hand raking to cover seeds should not be used. I recommend <br />that a tractor Dulled rake or the seed drilled be used. <br />G. I recommend the following seed mixture: ' <br />Streambank iaheatgrass - 3 lbs. PLS <br />:Vestern wheatgrass - 3 lbs. PLS <br />Russian wildrye - 1 lb. PLS <br />Alkali sacatone - 1 lb. PLS <br />Indian ricegrass - 3 lbs. PLS <br />Alsike clover - 1 lb. PLS <br />Yellow sweet clover - 1 lb. PLS <br />Double the amount if broadcast seeded. <br />H. I recommend the following shrubs should be planted seedlings: <br />Antelon_e bitterbrush <br />Rubber rabbitbrush <br />Alountain Tlahogeny <br />Current (These should be planted S to a <br />clump and 20 feet apart) <br />I. I recommend you do not start revegetation in July., <br />Buena Vista Pit - File Vo. 77-196 <br />1. "4ininA Plan <br />A. .4 re you working now? <br />B. !alhat is the dep_ th of the pit? <br />C. How many acres are mined each year? <br />D. In w hat direction is mining proceeding? <br />E. How long will the operation last? <br />F. 1Vi11 you affect the railroad found on the east side of the <br /> Dlt? <br />2 . ~? aD <br />A. Outline in red where the affected land will be? <br />3. Soils <br />A. 1~Jhat is the death o.f the Ouray topsoil? <br />