My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43696
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43696
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:46:10 PM
Creation date
11/20/2007 11:40:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000087
IBM Index Class Name
Permit File
Section_Exhibit Name
EXHIBIT J VEGETATIVE INFORMATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />EXHIBIT L -RECLAMATION COST <br />We have selected the phase of the mining that includes the largest area that will be disturbed at one <br />time to calculate the potential reclamation liability. This will occur during phase 3. <br />Activity Quantity Units Unit Cost Cost <br />A. Stripped overburden and topsoil- <br />approximately 40 acres of disturbance <br />I. Replace overburden 87,266 CY $.84 73,304 <br />2. Replace l2" of topsoil 64,533 CY $.84 54,208 <br />3. Seed and mulch 40 Acres $400 16,000 <br />B. Road - to remain for future access <br />C. Processing area -equipment is portable and <br />would be removed by the operator <br />1. Remove concrete base for scale 120 CY $65 7,800 <br />2. Scarify ground 10 Acres $150 1,500 <br />3. Spread l2" topsoil 16,200 CY $.84 13,608 <br />4. Seed and mulch 10 Acres $400 4,000 <br />D. Settling pond <br />1. Place overburden 5'on 1 acre 8,100 CY $.84 6,804 <br />2. Place topsoil 12" on I acre 1,620 CY $.84 1,360 <br />3. Seed and mulch l Acres $400 400 <br />E. Phase 2 lake shore final grade seed & mulch <br />1. Finished Grading 21,000 CY $.84 <br />2. Replace topsoil - 12" on 3 acres 5,000 CY $.84 17,640 <br />3. Seed and mulch 3 Acres $400 4,200 <br /> 1,200 <br />F. Silt pond reclamation wetland creation <br />I. Seed to specified wetland mix. 17 Acres $400 6,800 <br />G. Plantings <br />1. Plant trees and shrubs I LS $40,000 40,000 <br />Total of Disturbance Costs 248,824 <br />Contractor Mobilization (10%) 25,000 <br />Overhead (l5%) 41,073 <br />Administration (5°fo) 13,691 <br />Total 328,588 <br />Disturbed acreage - 71 acres <br />Financial warranty per acre - $4,628 <br />AGGREGATE INDUSTRIES, INC. -- MILLIKEN RESOURCE 112 PERMIT PAGE 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.