Laserfiche WebLink
~~ <br />~~ <br />• Pond Summary <br /> 99=P1 9,_P2 9-P3 5A-P22 SA-P32 <br />Sediment - - - <br />Sediment Elevation - - - <br />Pond Volume 6.6 x x 3.6 0.9 <br />Constructed Hgt. 10 8 8 5 9.5 <br />Crest Elevationl 102.6 - - - - <br />Crest Length 400 280 170 300 100 <br />Top Width 30 13 10 35 10 <br />Spillway Crestl 99.6 - - - - <br />Elevation <br />Spillway Crest 11 x x x ~ <br />Length 'a <br /> <br />Spillway Operating 2.6 x 2.9 1-2 <br />• Head & Freeboard - <br /> <br />(feet) <br />~ o <br />_ <br />Embankment Slopes <br />Upstream 2.2:1- 5:1 2.5:1 6:1 4.2:1 <br />Downstream 8:1 6:1 2.5:1 7:1 2.5:1 <br />1 Relative elevation; not tied to map elevation <br />2 Ponds 5A-P2 and 5A-P3 have been reclaimed <br />_P2_ <br />