My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43533
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43533
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:59 PM
Creation date
11/20/2007 11:36:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007003
IBM Index Class Name
Permit File
Doc Date
4/27/2007
Doc Name
Gen. Permit- Stormwater Discharges
From
CDPS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTI <br />Page 9 <br />Permit Na COGS00000 <br />C. EFFLUENT LIMITATIONS AND CONDITIONS - STORMWATER DISCHARGE (continued) <br />5. SWMP Availability <br />A copy of the SWMP shall be provided to the Division, the Colorado Division of Minerals and Geology (CDMG), and/or to EPA <br />upon request, and within the period specified in the request. <br />All SWMPs required under this permit are considered reports that shall be available [o the public under Section 308(b) ofthe <br />CWA. The owner or operator of a facility with storinwater discharges covered by this permit shall make plans available to <br />members of the public upon request. However, the pertnittee may claim any portion of a stonnwater pollution plan as <br />confidential in accordance with Section 308 of the Federal Clean Water Act and Regulations for the State Discharge Permit <br />System 61.5 (4). <br />6. SWMP Preparation and Implementation <br />The SWMP shall be prepared prior to applying for coverage under the general permit, and certification of completion <br />submitted with the application. Also, the SWMP shall be implemented when the facility begins operations, or when the <br />general permit certification is issued, whichever is later, and updated as appropriate. <br />7. Prohibition of Non-Stormwater Discharges <br />Except as provided in paragraph b, below, all discharges authorized by Part I.C. ofthe permit shall be composed entirely <br />of stormwater. Discharges of material other than stormwater must be addressed in Part I.B. or in a separate CDPS <br />permit issued for that discharge. <br />b. Discharges from the following sources that are combined with stormwater discharges associated with mining activity <br />may be authorized by this permit, provided that the non-stormwater component of the discharge is identified in the <br />SWMP (see Par[ LC.2.c.4 of the pecmi[}: fire fighting activities, uncontaminated compressor condensate, irrigation <br />drainage, lawn watering, air conditioner condensate, uncontaminated seeps and springs, and foundation or fooring drains <br />where flows are not contaminated. <br />8. Record keepine and Internal Reporting Procedures <br />The permittee shall identify procedures for record keeping and internal reporting. <br />9. Employee Education <br />The perrnittee shall develop and implement employes education programs to irtfonn personnel at all levels of responsibility of <br />the components and goals of the SWMP. Education should address topics such as spill response, good housekeeping, and <br />material management practices. The permittee shall identify periodic dates for such instruction. <br />D. MONITORING AND REPORTMG <br />Representative Sampling <br />Samples and measurements taken as required herein shall be representative of the volume and nature of the monitored discharge. <br />Failure to submit the reports as required in either Pan LD.3 or LD.4 shall constitute a violation of the permit and may constitute <br />grounds for revocation of the petmittee's authority to discharge under the permit. <br />2. Sampling- Stormwater <br />Sampling and testing of stormwater for sptcific parameters under Part LC is not required on a routine basis under this permit. <br />However, the Division reserves the right to require sampling and testing beyond this, on a case-by-case basis, at any facility covered <br />by this permit, in the event that there is reason to suspect that compliance with the SWMP is a problem, or to measure the <br />effectiveness of Ne BMPs in removing pollutants in the effluent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.