Laserfiche WebLink
ORE LOADING SCHEDULE <br /> <br />Xear <br />I <br />Phase 1 <br />Phase IUIII <br />Phase N <br />i 1995 7.2 Mt N/A NIA <br />1996 9.1 Mt 0.6 Mt N/A <br />1947 2.1 Mt 8 Mt N/A <br />1998 3 Mt 7.7 Mt N!A i <br />1999 4.1 Mt 7.1 Mt N/A <br />2000 4.1 Mt 7.2 Mt N/A <br />2001 4.2 Mt 8.2 Mt NIA <br />2002 11.9 Mt 5.6 Mt N)A <br />2003 11.1 Mt 6.1 Mt 2.8 Mt <br />2004 1 Mt 29 Mt 16.1 Mt <br />2005 2.5 Mt 4.6 Mt 12,9 Mt <br />2006 4.6 Mt 7.3 Mt 8.3 Mt <br />2007 5.9 Mt 6.8 Mt 7.3 Mt <br />2008 6.5 Mt 5.8 Mt 7.7 Mt <br />2009 5.3 Mt 7.1 Mt 7.6 Mt ~ <br />2010 5.7 Mt 3.8 Mt 10.5 Mt <br />2011 Est. 6.6 Mt 6.6 Mt 6.8 Mt I <br />2012 Est. 1 Mt I Mt 1 Mt j <br />Ore production schedule based on 95Z pcf dry density <br />Schedule per M .7ahraus <br />1:\0012203\0400\PHJWTRBAID<02N032203.Oa00.03630APB.DOC Golder Associates <br />