Laserfiche WebLink
<br />-3- <br />Please amend your estimate of reclamation costa to include the following: <br />A. Phase I-VII (max. disturbance of 170-200 acres) <br />- Backfill and grading for shoreline, cubic yards required <br />- Backfill and grading for cropland, cubic yards required <br />- Scarification <br />- Topsoil replacement for shoreline, and haul distance, <br />cubic yards required <br />- Topsoil replacement for cropland, and haul distance, <br />cubic yards required <br />- Seedbed preparation <br />- Revegetation <br />B. Plant Processing Site <br />- Shop removal <br />- Concrete Plant removal <br />- Scale and office removal <br />- Crushing and screening plant removal <br />- Asphalt plant removal <br />- Backfilling of wash pond, cubic yards required and haul <br />distance <br />- Backfilling of settling ponds, cubic yards required and haul <br />distance <br />C. Rail Spur <br />- Rail spur removal <br />- Field conveyor removal <br />D. ~ Indirect Cost <br />- 20.81 of direct coat <br />~~ 10. WILDLIPB BABITAT <br />The Division believes that the attached recommendations by the Division of <br />wildlife are consistent wiCh the proposed post mining land use and should <br />be incozporated into the permit. Please address. <br />The decision deadline for the application is December 13, 1993. Therefore, we <br />would appreciate your response to these nine (9) items no later than <br />December 3rd- Please contact me at 866-3567 if you need additional time. <br />Sincerely, <br />'F~aE,~~Z iZ"- V <br />XThomas A. Schreiner ~_ V <br />Environmental Protection Specialist <br />TAS/ern <br />cc: Jim Stevens, DMG <br />M:\oss\ern\midwest.tas <br />