Laserfiche WebLink
<br /> <br /> <br /> <br />l~ <br />1 <br />1 <br />1 <br />LI <br />1 <br />~I <br />u <br />1 <br />I' <br />1 <br /> <br />1 <br />1 <br />~1 <br />TABLE OF CONTENTS (con't) <br />Paae No. <br />D.8 Water Balance D-57 <br /> D.8.1 Tailings Disposal D-58 <br /> D.8.2 Heap Leach .Facility D-58 <br /> D.8.3 Mine Pit Dewatering D-59 <br /> D.8.4 Yater Balance Summary D-59 <br />D.9 Diversions, Sediment Control, and Drainage D-60 <br /> Crossings <br /> D_!.1 Diversion Ditches 0-60 <br /> D.l.2 Sediment Control D-60 <br /> D_!.3 Drainage Crossings D-66 <br />D.10 Ancillary Facilities 0-71 <br /> 0.10.1 Haul Roads D-71 <br /> D.10.2 Power Supply D-7l <br /> D.IO.3 Water Supply p-71 <br /> D.10.4 Office and Shop D-71 <br /> 0.10.5 Fuel Storage p-7P <br /> D_10.6 Sanitary and Solid Waste p-72 <br /> 0.10.7 Fencing and Security p-77 <br />D.11 Pnject York Force D-73 <br />D.12 Aaciie~ts and Emergency Response p-73' <br />D.13 Mime /lan References p-7Q <br />EXHIBIT E RATION PLAN E-1 <br />•.'. E.1 Present and Past Land Use E_1 <br />E.2 Geaxral Reclamation Procedures E_2 <br /> E.2.1 Topsoil/Growth Medium Stockpiling E_q <br /> and Use <br /> E_2.2 Erosion and Sediment Control E-4 <br /> E_2.3 Cradirg and Stabilization E-5 <br /> E_2.4 Sartace and Seedbed Preparation E_5 <br /> E_2.S Seeding Mixtures and Rates E-6 <br /> E2.i Neclamation Scheduling E_7 <br />E.3 Rieclasation Implementation E_g <br /> E.3.1 Mine Pits E-8 <br /> E.3.1.1 East Pit E-g <br /> E.3.1.2 West Pit E-10 <br /> <br />