Laserfiche WebLink
<br />' will be conducted during the course of operations to ensure that the mining <br />operation is not impacting the stream. Ongoing groundwater monitoring will also <br />be conducted both up and downgradient of the proposed heap leach and tailings <br />disposal area. for information on existing water quality and quantity, and <br />proposed future monitoring, see Exhibit G, Water Information. <br />Battle Mountain plans to reclaim project area disturbances to provide for <br />1 post-mining land uses of rangeland and wildlife habitat. Where possible, <br />disturbances will be reclaimed concurrently with ongoing mining operations. <br />' Concurrent reclamation may be possible in waste rock disposal areas and in the <br />East Pit. The majority of the site reclamation will take place at the time of <br />t mine closure. Exhibit E provides a more detailed description of proposed <br />reclamation. <br />L <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br />i <br />1 <br />iii <br />1 <br />