My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43403
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:52 PM
Creation date
11/20/2007 11:33:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Permit File
Doc Date
7/27/2001
Doc Name
RESPONSE TO DMG COMENTS LORENCITO SURFACE MINE PHASE 1 LAS ANIMAS CNTY COLO JOB 32,611
From
CTL THOMPSON INC
To
LORENCITO COAL CO LLC
Section_Exhibit Name
EXHIBIT 13 EMBANKMENT LETTER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~~ <br />~• <br />~' <br />fem. <br />'~ o <br />SEDIMENTATION POND EMBANKMENT <br />TYPICAL SECTION <br />NO SCALE <br />Lorenclto Surface Mlne <br />Pttue I <br />Job No. 32,611 <br />1.) SITE PREPARATION <br />PRIOR TO PLACING FILL, THE AREA SHOULD BE STRIPPED OF ORGANIC <br />TOPSOIL OR OTHER DELETERIOUS MATERIALS. <br />2.) ACCEPTABLE FILL MATERIALS <br />SUITABLE FILL MATERIALS CAN BE OBTAINED FROM POND EXCAVATIONS OR <br />FROM NEARBY BORROW SOURCES. SUITABLE MATERIALS INCLUDE NATIVE CLAY <br />SOILS, CLAYEY SAND SOILS, AND BEDROCK MATERIALS WHICH ARE BROKEN <br />DOWN TO THESE SOIL TYPES (S~C, GC, CL AND CH). BEDROCK MATERIALS <br />SHOULD BE PROCESSED TO PRODUCE A SOIL LIKE MATERIAL WITH MAXIMUM <br />PARTICLE SIZE OF 6 INCHES. THE MATERIALS USED AS EMBANKMENT FILL <br />SHOULD HAVE AT LEAST 25 PERCENT FINES (MATERIAL FINER THAN <br />N0. 200 SIEVE). <br />3.) UNACCEPTABLE FILL MATERIALS <br />MATERIALS NOT CONSIDERED SUITABLE FOR USE AS EMBANKMENT FILL INCLUDE <br />CLEANER SAND AND GRAVEL. ALSO UNACCEPTABLE ARE HIGHLY CARBONACEOUS <br />MATERIALS OBTAINED FROM BEDROCK EXCAVATIONS OR WELL-CEMENTED <br />SANDSTONES WHICH DO NOT BREAK DOWN TO SOIL LIKE MATERIAL. HIGHLY <br />ORGANIC SOILS OR MATERIALS CONTAINING CONSTRUCTION DEBRIS ARE ALSO <br />NOT ACCEPTABLE. FROZEN SOIL IS NOT ACCEPTABLE. <br />4.) FILL PLACEMENT AND COMPACTION <br />THE EMBANKMENT FILLS SHOULD BE PLACED IN THIN HORIZONTAL LIFTS (ON THE <br />ORDER OF 8 TO 12 INCHES LOOSE THICKNESS.) THE FILL SHOULD BE MOISTURE <br />CONDITIONED TO WITHIN 2 PER~ENT OF OPTIMUM MOISTURE CONTENT AND <br />COMPACTED TO AT LEAST 95 P RCENT OF STANDARD PROCTOR MAXIMUM DRY <br />DENSITY (ASTM D 698). THE PLACING AND SPREADING OF FILL MATERIALS SHOULD <br />BE STARTED AT THE LOWEST POINT OF THE EMBANKMENT. FILL PLACEMENT AND <br />COMPACTION SHOULD BE OBSERVED AND TESTED BY QUALIFIED GEOTECHNICAL <br />ENGINEERING FIRM. <br />5.) MONITORING AND INSPECTIONS <br />MONITORING AND INSPECTIONS SHOULD BE PERFORMED BY QUALIFIED <br />INDIVIDUALS AS OUTLINED IN CDMG REGULATIONS 4.05.6 (13). <br />II <br />~X~}i~~T/3, ~/~'v~E 7~ <br />~~ Sedimentation <br />B~NKn?QU I ,~-~% ~ Pond <br />Details <br />Flg. 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.