Laserfiche WebLink
Rule 3: Performance Bond <br />• The balance of necessary fill material will be truck-hauled from Fill 8 as necessazy to <br />• achieve the final contour. <br />• The topsoil pile for this mine azea is located immediately east of the Year 1 mine area <br />and will contain about 100,000 LCY. <br />Table 3.02.2-12 summarizes assumptions and cost estimates for additional reclamation bond <br />increments at the end of Year 3 and the end of Yeaz 4 (maximum exposure during first 5-year <br />mining period). Tables 3.02.2-13 and 3.02.2-14 summarize calculations for the Year 3 and Year <br />4 estimates. The physical model detailed for Year 1 is very similaz to the model used for Years 3 <br />and 4, adjusted for the volumes and areas listed on Table 3.02.2-12. Calculation sheets <br />summarizing assumptions, volumes, and unit cost parameters are located at the end of this <br />section. <br />3.02.3 Period of Liability for Performance Bond <br />LCC will post a surety bond for the duration of the coal mining and reclamation operations and <br />fora 10-year period following reclamation. <br />3.02.4 Form, Conditions, and Terms of Performance Bonds <br />LCC will post a surety bond prior to permit issuance which will comply with the conditions and <br />• terms of this Rule. <br />u <br />3-lb (revised 07-01-02) <br />