Laserfiche WebLink
<br /> <br />Reclamation Area Table 3.02.2-14 <br />Larencito Canyon Mine Year Four Bund Calculation Summary <br />Task Description Material <br /> <br />Quantity' <br /> <br />Unit <br /> <br />Total <br />JejjCanyore Sediment Ponds <br />Assump(ioru: I. Clean sediment from ponds 2.0 CY track backhoe 58,080 CY $90,604.80 <br />Remove !0 ponds (001x, 002, 003, <br />004x, 005, 006, 0070, 008, 009, 009a) 2. Respread topsoil 300 hp dozer, 150' haul 17,747 CY $14,907.20 <br />Remove 3 fee/ ojsedimen[ per pond 3. Final grade ponds Motor grader, fine grade 58,080 SY $7,550.40 <br /> 4. Fertilizer, seed, mulch Hydro-seeder 12 AC $19,863.36 <br /> Total $132,925.76 <br />Lorenci(o Canyon Haul Road <br />Reclamation .. <br /> Rough grade stripped windrow into <br /> I. Backfill drainage ditches drainage ditch 8,889 SY $1,422.22 <br /> 2. Motor grader, rip haul road base 180 hp dozer, [ill boulder clay/claypan 5,926 C5' $4,622.22 <br /> 3. Topsoil respread 300 hp dozer, 150' haul 5,432 CY $6,627.16 <br /> 4. Fertilizer, seed, mulch Hydro-seeder 4 AC $6,080.00 <br /> Total $18,751.60 <br />Loreneilo Canyon Topsoil Piles <br /> I. Motor grader, rip stockpile base to <br /> re lieve compaction 180 hp dozer, tilWoulder clay/claypan 16,327 CY $12,735.01 <br /> 2. Final grading of site Motor grader, fine grade 53,240 SY $6,921.20 <br /> 3. Fertilizer, seed, mulch Hydro-seeder I I AC $!8,208.08 <br /> Total $37,864.29 <br />-a ~ <br />L. <br />~ a <br />3-14 <br />