Satellite Warehouse/Storage Area (MR 02-1791 <br />A Twentymile ranch warehouse/storage building and associated outside storage/parking azea will be utilized as a <br />satellite wazehouse/storage site by TCC. The site is located at the intersection of Routt County Roads 27 and 33 <br />and is shown on Map 24. When the building is no longer needed by TCC, the material stored there will be removed <br />and the building revert back to the status of a ranch wazehouse/storage facility. <br />Communicatiou Line <br />A communication line, as shown on Map 24, was installed to tie-in the warehouse with the existing network. A <br />segment ofthe line is buried, while the remainder is hung from existing poles. <br />Wastewater Treatment Faciliri <br />A new wastewater treatment facility was constructed at the Foide] Creek Mine. This facility was designed by <br />Schmueser Gordon Meyer, Inc., an engineering fum located in Glenwood Springs. The facility is an aerated lagoon <br />system, comprised of three treatment ponds and a "polishing" pond. The facility locations are shown on Map 24, <br />Surface Facilities. TCC has received both a site application and a dischazge permit for this facility. The Colorado <br />Department of Public Health renewed the dischazge permit number CO-0042161 on Mazch 1, 1995. <br />The treatment facility required the installation of sewer lines from the new bathhouse to the ponds and from an <br />existing bathhouse, which is located behind the shop/warehouse, to the ponds. As stated above, the treatment <br />facility required the construction of four ponds. The ponds were lined with clay. The cut and fill balance for the <br />ponds were estimated at 8,237 CY of cut and 5,297 CY of fill, which resulted in an excess of 2,940 CY. This <br />material was stockpiled adjacent to the facility at the location shown on Map 24. Prior to excavation, <br />approximately 12 inches of available topsoil was removed and stockpiled adjacent to the facility at the location <br />shown on Map 24. <br />TCC obtained approval to move slightly downslope of the wastewater lagoons disturbance area to establish a <br />borrow azea for the underlying clay materials. This material was used in construction of the compacted liners in the <br />previously approved wastewater lagoons. <br />MROS-J 96 2.05-19 8/24/05 <br />