My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43380
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:50 PM
Creation date
11/20/2007 11:33:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
REVISED AND NEW CHANNEL DESIGNS
Section_Exhibit Name
Exhibit 2.05-E3 SECTION 7
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Channel Designs <br />The surface water diversion dimensions were determined using 1\Iannings Equation Eor open channel <br />flow. All channels will be either gravel- or vegetated-lined channels. If flow velocities exceed 6 feet <br />per second, the channels will be lined with riprap or erosion will be controlled with the use of rock <br />check dams. Channels will be designed with a 0.3 Eoot freeboard. For channels where rock check <br />dams or straw bales are installed, a 1 foot freeboazd was added to the design depth. The Elk Creek <br />postmine channel will also be designed with a 1 foot freeboazd. Riptap sizes were determined using <br />Pader, OSM or limiting velocity methods. Given the uncertainty in determining riprap sizes for steep <br />grades, a factor of safety of 3 inches was added to the riprap Dso designed using the Pader method. <br />The limiting velocities were determined from the "Erosion and Sediment Pollution Control Program <br />1Vfanual", Bureau of Land and Water Conservation, Pennsylvania. The limiting velocities aze shown in <br />the channel design section. The Elk Creek channel was designed using the Simons/OSM method <br />which includes abuilt-in factor-of-safety. Riptap will consist of durable rock resistant to weathering <br />with a uniform gradation. <br />• This section contains design calculations for the following ditches: <br />Elk Creek Mine and D-Seam Portal Ditches <br />Yazd Ditches 1 and 2 <br />Berm Ditch <br />Refuse Ditches <br />Haul Road Ditch <br />Conveyor lA Ditch <br />East Clean Water Ditch <br />West Refuse Pile Diversion <br />West Refuse Ditch <br />East Refuse Ditch <br />Elk Creek Mine Ditches Dl, D2, D3 Upper, D3 Lower, D4, DS Upper, DS Middle, <br />DS Lower, D6, D7, D8 Upper & D8 Lower. <br />In addition, this section contains the design calculation for the following postmine temporary and <br />permanent ditches and channels: <br />• Substation 3 Channels <br />SS-1, SS-2, SS-3, & SS-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.