Laserfiche WebLink
{' 1 <br />U <br />• <br />I <br />52 Cameo Refuse Disposal Area No. 3 4 13 <br />53 Cameo Refuse Disposal Area -Cross Section & Details 4 13 <br />54 Permanent Flood Control Dike 4 13 <br />55 Cameo Refuse Disposal Area No. 2 & 3 -Details 4 13 <br />56 Roadside and Cameo No. 1 Mine - 5 18 <br /> Hydrologic Monitoring Map <br />57 Surface Electrical Distribution System 4 13 <br />58 2 West Portals 4 13 <br />59 Unit Train Loadout Facility 5 14 <br />60 Cameo Refuse Disposal Area No. 2 -Final Contours 4 13 <br />61 Greasewood Reference Area 3 10 <br />CM02-11-06 Cameo Refuse Disposal Area -Topsoil Salvage Plan 4 13 <br />CMC Mining Inc. January 20, 1976 -Topography Map (MROS, Vo17) 5 14 <br />RS-11-008 Roadside Mine Revegetation Field Trials of Refuse Pile 5 14 <br />RS-21-018 Roadside Mine 2nd East Section Subsidence 6 20 <br /> Monitoring Profile <br />RS-21-019 Roadside Mine 3" East Section Subsidence 6 20 <br /> Monitoring Profile <br />RS-21-020 Roadside Mine Subsidence Monitoring Profile 6 20 <br />RS-21-022 Roadside Mine Subsidence Monitoring Survey 6 20 <br /> Points Location <br />RS-21-023 Roadside Mine Subsidence Monitoring Profile 6 20 <br />RS-21-024 Roadside Mine Subsidence Monitoring Survey 6 20 <br /> North and South Line (A-Line) <br />RS-21-025 Roadside Mine Subsidence Monitoring Survey 6 20 <br /> North and South Line (C-Line) <br />RS-21-028 Roadside Mine Ute Water Line Subsidence 6 20 <br /> Monitoring Profile <br />SL-07-021 1985 Exploration Plan Proposed Drill Hole Location 1 2 <br /> and Road Construction <br />SL-16-009 South Fan 4 13 <br />GSD-002 Run Off Control Guard Shack Ditch 4 13 <br />xu <br />(Rev. 07/07/04) <br />