Laserfiche WebLink
• i <br />Reclamation of the pit wiU begin in the spring of 2000 and end in the fall of 2003. <br />~~~ Reclamation will begin in Area I, and proceed each year until the process is complete, the <br />pit has been divided into 4 areas, as shoym on the Revised Reclamation Plan Map. Each <br />QF~~. year the azea to be reclaimed will be re-graded so that it conforms with the Snal contours. <br />(shown as dashed red lines on the reclamation plan map); the gradiem will not exceed 3: t <br />in any location. After regrading, the stockpiled surface soil will be spread over the graded <br />area at a depth of 6" - 8". Both this soil and the soil beneath will be disced to insure that <br />seeding will take place on an uncompacted surface. <br />Sceding will be done according to the preliminary estimate of reclamation costs provided <br />by the pivision to the applicant on November 10, 1999 (11 pages). This estimate, and the <br />the tasks outlined in it ,have been accepted by Mr. Evan Melby and are hereby <br />incorporated imo the revised reclamation plan. <br />Grass planted wiU be Crested wheatgrass at the rate of 5.5 lbs pls per aae, Forbs planted <br />will be bfilkvctch at the rate of 6. S lbs pls per acre and yellow swea clover at the rate of <br />8.0 lbs pls per acre ,shrubs planted will be saltbush at the rate of 0.5 Ibs pLs per acre. <br />Total estimated cost of reclamation is 58,500 and financial surety has been posted. <br />ren& i`r_luA~ b ~°~~ul~ ~'~-~ <br />~~~~-P~~~~a r~. <br />SO ~ ~ BOtt8SZ8TLT ;~V3 Ot~80 888T/ST/ZT <br />