Laserfiche WebLink
i <br /> <br />TABLE OF DISTURBANCE <br />(Note: this table to be used in conjunction with previous sheets L- <br />2, L-3, aad L-4) <br />The acreages presented in this table are for a point in time when <br />the disturbance is maximized and equaling 108.2 acres. A portion <br />of a permanent lake and shoreline is present along with backfilled <br />land from the slurry pipeline. At the slowdown of the annual <br />mining season (November), 20 acres will have been mined that year. <br />Major (L-2~ <br />1. 5.0 acres New lake water surface (maximum active pit <br />area) <br />2. 15.0 Backfilled land by the slurry pipeline <br />3. 0.2 Shoreline on permanent lake, 966 if <br />4. 0.1 Topsoil stockpile, 38,000 cy <br />5. 0.4 Overburden stockpile, 155,000 cy <br />6. 0.5 Previous stockpile area <br />21.2 acres Subtotal <br />Moderate (L-31 <br />7. 15.0 acres Overburden and topsoil distributed on <br />backfilled land <br />8. 0.8 Railroad spur, 2060 if x 15 if <br />9. 0.2 Shoreline graded with topsoil and overburden <br />10. 4.8 Mine access roads, 2 miles x 20 if <br />11. 35.0 Plant processing area (implemented area) <br />12. 0.7 Field conveyor, 1 mile x 6 if <br />56.5 acres Subtotal <br />Minor ~ L-4~ <br />13. 15.0 acres Recently seeded backfilled land <br />14. 0.2 Recently seeded shoreline <br />15. 15.0 One year grass growth, backfilled land <br />16. 0.2 One year grass growth, shoreline <br />17, 0.1 Planted wetland <br />30.5 acres Subtotal <br />108.2 acres TOTAL <br />c.\97171 \dacb .cDl <br />L-5 <br />