Laserfiche WebLink
Revege[ation Cost Per Acre • <br />Revegetation Bonding - Yoast <br />Seedbed Preparation Cost/Ac. <br />D-SH Tractor + Operator <br />561.30/hr x 0.5 hr/ac f 30.66 <br />Offset Disk (10~-14~) <br />55.00/hr x 0.5 hr/ec 2.50 <br />Total f 33.16/ac <br />Drill Seeding Mix 1 <br />D-SX Traetor + Operator <br />561.30/hr x 1.0 ac/hr S 61.30 <br />Drill Seeder <br />515.00/hr x 1.00 ec/hr 15.00 <br />Seed Mix 1 180.00 <br />Total 5256.30 <br />Drill Seeding Mix 2 <br />D-SH Tractor + Operator <br />561.30/hr x 1.0 ac/hr f 61.30 <br />Drill Seeder <br />f 15.00/hr x 1.0 ac/hr 15.00 <br />Seed Mix 2 70.00 <br />Total 5146.30 <br />Drill Seeding Mix 3 <br />D-SX Tractor * Operator <br />561.30/hr x 1.0 ac/hr S 61.30 <br />Drill Seeder <br />515.00/hr x 1.0 ac/hr 15.00 <br />Seed Mix 3 85.00 <br />Total f161.30 <br />Broadcast Seeding Mix 1 <br />Laborer + Broadcast Seeder <br />f 13.04/hr x 1.0 ac/hr S 13.04 <br />Seed Miz 1 (2 x Drill Rate) 360.00 <br />Total 5373.04 <br />Drill Seed Lover Cro <br />D-SH Tractor + Operator <br />f61.30/hr x 1.0 ac{hr S 61.30 <br />Drill Seeder <br />515.00/hr x <br />1.0 ac/hr <br />15.00 • <br />Sixrou Barley (20 lbs/ac) 4.00 ' <br /> Total S 80.30 <br />25-5-2 <br />