Laserfiche WebLink
I <br /> <br />I• <br /> LIST OF TABLES <br />Table No. <br />1.2-1 Permits and Licenses for Surtace Mining and Reclamation Operations at <br /> Trapper Mine <br />1.2-2 Permits and Licenses for Surtace Mining and Reclamation Operations for <br /> Affiliate Coal Operations, held by the principal shareholders of Trapper <br /> Mining Inc. <br />1.4-1 Summary of costs for Trapper Mine Bond Determination <br />1.4-2 Summary of Regrade Costs <br />1.4-3 Calculations for Time Required to Regrade Pits <br />1.4-4 Calculations for Drill and Blast Costs <br />1.4-5 Calculations for Time Required to Regrade Roads <br />1.4-6 Calculations for Time Required to Regrade Impoundments <br />1.4-7 Calculations for Time Required to Regrade Diversions <br />1.4-8 Summary of Topsoil Replacement Costs <br />1.4-9 Calculations for Time Required for Retopsoiling <br />1.4-10 Summary of Revegetation Quantities and Cost Calculations <br />1.4-1 t Production, Material and Total Revegetation Costs by Revegetation <br /> Treatment with a Total Revegetation Cost for each of the Three <br /> Land Use Types <br />1.4-12 Revegetation Treatment Sequencing and Associated Production Costs <br /> per Acre Excluding Topsoiling <br />1.4-13 Equipment and Operator Cost Estimates for Revegetation Work <br />1.4-14 Current Local Revegetation Material Cost <br />1.4-15 Change in Disturbance to Determine Worst Case Year for Bond <br />1.4-16 Miscellaneous Costs <br />~oioz <br />iii-1 <br />P_ acme <br />1-9 <br />1-11 <br />1-32 <br />1-34 <br />1-35 <br />1-35f <br />1-36 <br />1-37 <br />1-39 <br />1-42 <br />1-43 <br />1-54 <br />1-55 <br />1-56 <br />1-57 <br />1-58 <br />1-59 <br />1-59a <br />~~3v/C 3 <br />