Laserfiche WebLink
• RECLAMATION PLAN <br />The reclamation plan proposed for the flood control dike is to leave it <br />in place at the Bear No. 3 mine facilities site. <br />Bear Coal Company plans to mulch and seed the eastward facing slope of <br />the dike this fall (1985). The riverside slope has been adequately <br />riprapped to ensure long-term integrity. <br />Meetings will be scheduled with the Gunnison County Planning Commission <br />to involve them in the final decision regarding the flood control dike. <br />Once their input is received, this information will be passed along to <br />the Division. <br />u <br /> <br />