Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br /> ~ 1 <br /> s <br />PROJECT IDENTIFICATION <br /> Agenry or orpanizalion name : DMG <br />TaskC: 002 Stara: COloracb Permillob %: M-2000-103 <br />Dale: 10/132 0 0 0 County: La Plata Abbreviation :none <br />User: RCO Site:Aps Trucking And Excavat/on, Filename:M103-002 <br />Permit or other jah action :Final reclemeBon -new 110 eppl/ceflon <br />task aescdption :Rip compaction on pad area (no slope areas) <br />.. :........:..~....rb `.v... 3" ::,.-' ''~^'_r'?+I'+.?x~~"sa::'_":~sII°4mb $ t~'.. ~.- <br /> <br />T. .,.~ycd .., i <br /> <br />..., <br />yW ~~~ <br />HOURLY EQUIPMENT COST Basic machine :Cat 06H Sedes 2 (1997) Horsepower : 165 <br />Blade type : Sfmight <br />ABachment no. 1 : ROPS Cab Shifl basis : 1 per day <br />Aflachmenl no. 2 :3~henk dpper <br />Utilization % Cost data source : (CRG) <br />Cast Breakdown : Ownership cosUhour : $22.34 NA <br />Operating cost/hour: $29.77 100 <br />Ripper op. cosUhour: 53.06 100 <br />Operator cosUhour: 523.12 NA <br />Total unit crosUhour : 578.28 Total Beet cosVhr : $78.28 <br />MATERIAL QUANTITIES <br />Seismic <br />method <br />Area <br />method <br />Selected estimating method : Alga <br />NA NA Load factor: NA Bank volume: IJA BCY <br />0.50 Acres Rip depth (fl): 1.50 <br />volume: '/,210 BCV or CCV <br />Source o! quantiy lakeofl : Pertnll map, pad area will trot Increase <br />Source of material load factor : NA <br />F_ <br />HOURLY PRODUCTION <br />Seismic method : Material seismic velocity: NA teat per second <br />Unadjusted houdy production : NA BCY or CCY/hr <br />Area method : Average dppinp depth per pass : 1.50 teat <br />Average ripping width per pass: 6.SB feet <br />Average ripping length per pass : 100.00 leer <br />Average velocity of machine : 88.00 feet per minute <br />Average machine maneuver time / pau : 0.25 minNes <br />Hourty producticn per unit area : 0.651 acres per hour <br />Unadjusted houdy production : 1,582.08 BCY or CCY/hr <br />Correction factors : Unadjusted houdy production : 1,582.08 BCY or CCY/hr <br />Site altitude: 6,440 feet <br />Altitude adjustment: 1.00 (Car HBJ <br />Joh eRicienry (actor: 0.83 (1 sh18/day) <br />Net job correction: O.B3 multiplier <br />Adjusted hourly unit production : 1,317.12 BCY or CCY/hr <br />Adjusted houry Beel production : 1,313.12 BCY or CCY/hr <br />-,-~. .o.-c. ~. , kw ..; .. <br />- y,',.i fir 'r~3~3u".r..... , " ~3 L~s'.a4G}' >,~ ``ic~.i <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 0.92 Hours <br />Unit cost : 50.060 /LCY Total job cost : $]2 <br />