Laserfiche WebLink
III IIIIIIIIIIIIIIII ~ ~ <br />STATE Or COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Natural Resources ~:'-~ 1! _ <br />1313 Sherman SL, Room 215 ~, ,, 1• r,„a;_, <br />Denver, Colorado 80203 I `i .~` ';~ i_•+.; ` D I V I S I O N O r <br />Phone: (3031866-3567 rr r=-t-. ~.~j~Y MINERAL 5 <br />FAX:1303183_'-8106 '-(1 ~_• be <br />_ ~ ~ Zdud - 0 <br />October l6, 2000 RF r+ `-~--L-.L 3_ G E O L O G Y <br />C`/1' 61~(~~~_{l~/~Flr /-,~i-„' MENINGMSAFETY <br />Allen P. Small QCj? Vc~ A r0(`e,~(,F•Q F~-G/r.~V, <br />Allen P. Small Trucking and Excav Inc. ~ /+ f sail oven, <br />Governor <br />Durango, 00381301 bqo/~~~eta/sd~~0 E rc~~ i,c o~reclnr <br />~eo~o micnae~ a ~n~s <br />Re: APS Trucking and Excavation, [nc. Site, New Con~ffuction Materials 110 Permit Application Di~i~ion D~recior <br />APPROVED, Reclamation Cost Estimate. <br />Dear Mr. Small, <br />I have reviewed all the initial and follow-up materials for the above-named permit application, and found them to <br />adequately address the requirements. I have forwarded the approval paperwork to our Denver office; you will be <br />formally notified of this approval decision by separate letter. <br />Enclosed you will find the reclamation cost estimate package, consisting of a stlnunary sheet of all tasks and costs, <br />followed by the individual task sheets showing the details of each necessary task, and the equipment performance <br />sheets. The calculated total cost is $7, 113, which may appear fairly high for reclaiming a site this size. However, <br />you will notice that about 75% of the direct costs consist of the excelsior mulch materials and application. <br />Your financial warranty will presumably be in the form of a corporate surety, for which you pay an annual <br />premium. If, as you stated, this operation has a life of only a couple years, the bond total and premium amount may <br />not matter much. These costs were based on the reclamation plan, as submitted and approved. If you wish to <br />revise the plan in the future to reduce the bond amount required, you may apply for a technical revision. <br />Please ensure that you post the required permit ID sign and mark the permit boundaries. I would highly <br />recommend that you obtain a copy the Construction Materials Rules and Regulations; if you need a copy one may <br />be picked up here or mailed to you. <br />If you have questions about transferring your bond to this permit or have other bond related questions, please <br />contact Ms. Suzi Ericksen in our Denver office (see letterhead). For any questions about the costs in the enclosed <br />package, I may be reached at the Division's Durango field office: 701 Camino del Rio, Room 12~, Durango, CO <br />81301; tel 247-5193 or fax 247-5104. <br />Sincerely, 0 <br />~~~ ~~ <br />Bob Oswald <br />Environmental Protection Specialist <br />encl: reclamation cost estimate <br />cc (w/ encl): Kirk Allen, Southwest Land Services, Inc. <br />cc (w/out encl): Suzi Ericksen, DMG a.~aps t toappr fv.~/rco <br />