Laserfiche WebLink
<br />GEX COLORADO INC. <br />RECLAMATION PLAIT <br />OVERLAND CONVEYOR <br /> Unit <br />item uantit Unit Cost <br />Removal of Structures <br />Labor 3,360 Man/Hr E 17.20 <br />Equipment. 1,560 hr 29.30 <br />Earthwork <br />Excavation Cu-Yd <br />fill Cu-Yd <br />Spreading Topsoil 4,800 Cu-Yd 1.25 <br />Orill Seeding 6 Acre 40.00 <br />Mulching 6 Acre 175.00 <br />Hydroseeding & Mulching Acre 900.00 <br />Fertilizer Acre 372.00 <br />Seed 6 Acre 64.00 <br />Totals <br /> <br />Cost <br />E 57,192 <br />45,708 <br />6,000 <br />240 <br />1,050 <br />384 <br />5111,174 <br />