Laserfiche WebLink
POWDERHORN COAL COMPANY <br />• ROADSIDE MINE SOUTH FAN LOCATION <br /> TABLE 2 <br /> RECLAMATION PLAN COST ESTIMATE <br /> UNIT <br /> ITEM UAQ NTITY UNIT COST COST <br /> Removal of Structures <br /> Labor ~ 16 Man/Hr S 17.20 S 275 <br /> Equipment l6 Hr. 29.30 464 <br /> Earthwork <br /> Fill 1600 Cu-Yd 1.50 2400 <br /> Fill Shaft 600 Cu-Yd 2.50 1500 <br /> <br />• Spreading Topsoil 300 Cu-Yd 1.25 375 <br /> Material (Concrete) 8 Cu-Yd 60.00 480 <br /> Drill Seed 1.7 Acre 40.00 68 <br /> 7 Acre <br />1 175.00 298 <br /> Mulching . <br /> Fertilizer 1.1 Acre 375.00 638 <br /> 1 Acre <br />1 64.00 109 <br /> Seed . <br /> TOTAL 86,612 <br />• <br /> TR-01 March 18, 1983 <br />