Laserfiche WebLink
IfiiL w~: .~a~ifi hi~TJ ~IrO ~FWH <br />~ •.' .•' CG'YI y-., , Si _, W+~rl c <br />~ .ff lu.:~.11 1'....J ", ~.~...~ •..... ~.. <br />~.~.. <br />• POL'1DERHO NY <br />RN <br />`!L <br />OMP • <br /> C <br />C <br />A <br /> RECLAh1ATiON COSTS <br /> CAhiEO REFUSE DISPOSAL AREA NO. 2 <br />ITEM QUANTITY UNIT UNIT COST TOTAL COST <br />REMOVAL OF STRUCTURES <br />1) Culverts (6) <br />Labor 12 Man Hr 17.20 $ 206 <br />Wheel Backhoe <br />lY(th Operator 6 Hr 36.00 216 <br />2) Spillway and Dewatering <br />Devices <br />Labor 16 Man Hr 17.20 275 <br />Wheel Backhoe <br />With Operator 8 Hr 36.00 288 <br />3) Sediment Pond <br />D-8 Dozer With <br />Operator 2 Hr 90.00 180 <br />Fill 4,200 Yd3 Available -D- <br /> on site. <br />Scraper 637D 7 Hrs 211.63 1,461 <br />EARTHIYORK <br />i) Runoff Containment <br />Ditches D-8 Dozer 10 Hrs 90.00 900 <br />with U Aerator <br />