Laserfiche WebLink
C <br />.. <br />PART I <br />Page le of 19 <br />Permit No. C7D-0000906 <br />(d) Monitoring Requirements for Location Below Disd~arge Point 007 <br />Effluent Parameter Meascitanent Frequency d,, Samnle Type J <br />~~~, C~DD3, m4/1 <br />R~a~peiature, of <br />pH, s.u. <br />Monthly GSab <br />Monthly C,1ab <br />Monthly Crab <br />Sampling by the permittee far oaa~pliance with the monitorirg requirements <br />specified above shall be performed at the location below Disrha*;e Point 007 <br />which the permittee is to select. An exist location is to be indicated on a <br />sketch (with verbal description) submitted by the permittee and attached to <br />the first LI~7R. <br />2. Burden of Proof Requirements For Stormwater Runoff Discharge Requirana~ts <br />' In onier for the permittee to utilize the limits in Fart I. A. 1. (c), the <br />~~ Division is requiring the follaaing information as the permittee's "Yntrden <br />of proof" to justify using the lesser *~,; r~*+*G. <br />{~ a) Discharge as the Result of Rainfall <br />For the permittee to only monitor the parameters listed in Part I. A. 1. <br />c.) (with TSS and total iron limits waived), it is r~~ary to prove <br />that the disd~arge occurred within 48 hours after m~~~hle <br />precipitation has stopped. In addition, to only monitories the <br />para!~9 *p*s listed in Part I. A. 1. c.j (with settleable solids, TSS and <br />total iron limits waived), it is necessary to prove that the discharge <br />~~ occurred within 48 hours after precipitation greater than the 10 year, <br />24-hour event has stopped. <br />,~~. <br />,, <br />''. <br />1....- <br /> <br />