My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43023
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:26 PM
Creation date
11/20/2007 11:25:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006021
IBM Index Class Name
Permit File
Doc Date
1/18/2007
Doc Name
Permit Appl Approval Ltr
From
DRMS
To
Glade, LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatlnst Software <br />PROJECT IDENTIFICATION <br />Date : 02Jan-2007 Permit or job no.: M-200&021 Site :Glade Quarry <br />User : RMW Abbreviation : none State :Colorado <br /> Filename: M021-000 County :Larimer <br /> Agency or organization name :ORMS <br /> Permit orjob action :Initial Bond Calculation <br /> <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Mobilize/DemobilizeEquipment mobilize 1 5.0 $2,308 <br />002 -Rip Roads, Storage Area and Quarry Floor dozer 1 10.9 $1,887 <br />003 -Replace Growth Medium scrapet2 1 27.61 $5,382 <br />004 -Rough Grading of Growth Medrum dozer 1 43.6 $7,192 <br />005 -Backflll Detention Pond scraper2 1 21.4 $4,171 <br />006 -Revegetate 7.38 Acres revege 1 8.0 $11.538 <br /> suerorALS: 116.72 $32,478 <br />' inUUdes inflatlon factor adjusMent of : NA °/a TOTAL DIRECT COST • _ $32,478 <br />ECT COSTS <br />OVERHEAD AND PROFIT - Liability InsUfanCB : 2.02 % Of d12Ct total = $856 <br />Performance bond : f.05 % of direct total = $341 <br />Job superintendent : NA' NA NA total = NA <br />Profit ; 10.00 % of direct total = $3,248 <br />Trot required (or eqp. operator senres as super.) TOTAL O 8 P = $4,245 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $36,723 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $1,836 <br />CONTINGENCY - NA' NA total = NA <br />' crontirperxies accounted Jarat fask level TOTAL INDIRECT COST = $6,581 <br />TOTAL BOND AMOUNT (direct + Indirect) _ $39,059 <br />
The URL can be used to link to this page
Your browser does not support the video tag.