My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE43005
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE43005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:25 PM
Creation date
11/20/2007 11:24:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
5/13/2005
Section_Exhibit Name
2.05 Operation and Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br />Main Entries & Sub-Main Entries <br />At West Elk Mine, from five to nine entries currently aze mined as main entries. The number of <br />entries depends on mining conditions, and ventilation and access requirements. As few as three <br />entries could be driven in special circumstances. The entries are used for intake and return air <br />ventilation, coal haulage, and men and material transportation. The entries are driven parallel to <br />each other on 60 to 100 foot centers. Crosscuts aze on 100 to 200 foot centers. The entries are <br />also separated as necessary by stoppings. <br />Room and Pillar Panels <br />In general, the F Seam room and pillar panels consisted of 6 to 8 entries driven parallel to each <br />other on 60- to 100-foot centers. Crosscuts were on 60 to 120 foot centers. Room and pillaz <br />panel entries consisted of intake and return ventilation, conveyor belt, haulage, and escape-ways, <br />sepazated as necessary by stoppings. During secondary mining of the room and pillar panels, <br />additional rooms may have been developed on one or both sides of the initial development. <br />Sufficient barrier pillars were left to protect the main entries and bleeder entries (if separate <br />bleeders were utilized). During secondary mining, partial or full pillar extraction was used, <br />depending on conditions in the panel. <br />Longwall Gate-Roads <br />. Room and pillar methods aze used to develop gate-road entries for the longwall mining <br />equipment. Generally, two to five parallel entries aze driven on from 55 to 120 foot centers. <br />Currently, athree-entry yield abutment design is typically used. The size and configuration of <br />longwall gate pillazs is based on the regional geology, and depth of cover. Different <br />configurations are now used in the eastern portion of the B Seam reserve. Longwall panel <br />barrier pillazs will be left to protect main entries and bleeder entries. <br />Bleeder Entries <br />Bleeder entries aze typically developed to ventilate active and previously mined longwall <br />areas until those azeas can be permanently sealed. Bleeder eritries are connected to the main <br />return air ventilation system. Continued use of bleeder entries is currently being evaluated. <br />Preliminary plans for the E Seam include a "bleederless" ventilation system resulting in <br />each panel being progressively and/or completely sealed upon completion of mining a <br />particular panel. This alternative may be implemented in the B Seam as well. <br />Barrier Pillars <br />A barrier pillar is a lazge block of solid coal left in place to protect active mine workings. Barrier <br />pillazs are left, as necessary, between longwall panels and main entries, between submains and <br />longwall panels, or in other azeas, as needed. Barrier pillars vary in size, and designs are based <br />primarily on life-expectancy and degree of protection required for the barrier. Design <br />criteria include depth of overburden, horizontal stresses, etc: In all cases, the dimensions of <br />2.05-8 Revised November 2004 PRII <br />
The URL can be used to link to this page
Your browser does not support the video tag.