Laserfiche WebLink
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :DMG <br />003 State :Colorado <br />09/20/2004 <br />ESC <br />County :Weld <br />Site :DuckwoRh Pit <br />Permit or other job action :New 112 Application <br />Task description :Replace Topsoil on 15 Acres <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 637G <br />-Push dozer :Cat D9R - 9SU <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader :NA <br />-W afar truck : NA <br />Cost Bre <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA NA <br />Utilization-machine : 99 100 NA NA NA NA <br />-Ripper attachment: NA 0 NA NA NA NA <br />OwnerhipcosUhour: $72.79 $51.07 NA NA NA NA <br />OperatingcosUhour: $167.71 $97.71 NA NA NA NA <br />Ripper op.cosUhour: NA $0.00 NA NA NA NA <br />Operator costlhour . $32.02 $31.83 NA NA NA NA <br />Unit subtotals : $272.52 $180.61 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $725.66 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : $725.66 <br />..:. ,: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 18,150 LCY factor: NA <br />Source of quantity take-off :DMG Estimate- based on 9" <br />Source of estimated swell factor : NA <br />Permitljob # :M-2003-091 <br />Abbreviation :none <br />Filename : M091-003 <br />volume: 18,150 LCY <br />