My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42972
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:23 PM
Creation date
11/20/2007 11:23:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004078
IBM Index Class Name
Permit File
Doc Date
3/30/2005
Doc Name
3 of 7 Mining Plan
From
Civil Resources
To
DMG
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�E1 /4COR., --------- - - - - -- <br />C.18 <br />�L <br />6 <br />D <br />Y 10' UNITED <br />POWER <br />EASEMENT ,I <br />1 � <br />❑ l 50'SUNE <br />���. EA T <br />TEMPORARY BERM - - - <br />■ <br />65' <br />SETBACK <br />❑ 25' <br />1- _"ACK AREA = 14.7 AC. <br />❑ L� (( 0 <br />C) q �] I MINI NGP) 0000 <br />a. I HIGH WALL 00 <br />APPROXIMATE 000 <br />LOCATION OF 0 <br />RECHARGE WELL 000 <br />I O <br />00 <br />\ ..00 AREA = 19.5 AC. <br />SILT /SETTLING POND <br />\ AREA = 11.9 AC- <br />I <br />r � - <br />�. DISCHZ <br />TO RIVER DISCHARGE <br />i' TO EXIST ROW <br />OIOMATE CL LOCATION <br />OF OGILVIE SEEPAGE DITCH <br />SURFACE OWNERS /APPLICANT: <br />SW TKO JOINT VENTURE PARTNERSHIP, LLC <br />333 WEST HAMPDEN, SUITE 810 <br />ENGLEWOOD, CO 80110 <br />FLOODPLAIN INFORMATION: <br />FLOODPLAIN INFORMATION IS FROM <br />FIRM FLOOD INSURANCE RATE MAP, <br />PANEL NO. 0802660983C, 0802660981C, <br />DATED MARCH 18, 1980 <br />NOTES: <br />1. AREAS NOT DISTURBED BY CURRENT MINING ACTIVITIES OR UNDER RECLAMATION WILL <br />BE MAINTAINED AS FARMLAND, PASTURE OR OTHER SUITABLE COVER CROP UNTIL <br />MINING BEGINS IN EACH PHASE. <br />2. PRIOR TO CONSTRUCTION ALL UTILITY, GAS WELL, OIL WELL, & WATER WELL LOCATIONS <br />MUST BE VERIFIED. <br />3. INTERNAL MINING HAUL ROADS TO BE WATERED ON A REGULAR BASIS TO <br />CONTROL DUST. <br />4. TOPSOIL d: OVERBURDEN WALL BE SEGREGATED AND STOCKPILED AROUND THE <br />PERIMETER OF THE MINING AREA. <br />5. TEMPORARY STOCKPILES VARY IN LOCATION AND SIZE INSIDE EACH PHASE. <br />6. CONFIGURATION OF BATCH PLANTS AND PROCESSING AREA MAY CHANGE TO <br />COMPLY WITH NOISE EMISSION REQUIREMENTS. <br />7• CONVEYOR/HAUL ROAD WILL EXTEND INTO EACH PHASE AS MINING <br />PROGRESSES. <br />8. REFER TO EXISTING CONDITIONS MAP, SHEET 2 OF 7, FOR STRUCTURE <br />OWNERSHIP. <br />9. THE TOE OF THE MINE SLOPE IS DEFINED AS THE CONTACT OF THE MINE <br />SLOPE WITH THE TOP OF WEATHERED BEDROCK. <br />10. THE MAXIMUM ALLOWED ENCROACHMENT OF THE MINE SLOPE TOE WITH <br />HIGHWAY 85 IS 100 FEET. <br />11. THE MAXIMUM ALLOWED ENCROACHMENT OF THE MINE SLOPE TOE WITH THE <br />FULTON LATERAL IS 95 FEET. <br />12. THE MAXIMUM ALLOWED ENCROACHMENT OF THE MINE SLOPE TOE TO WCR 6 <br />AND WCR 8, WITHIN 1300 FEET OF HIGHWAY 85, IS 75 FEET. <br />13. THE OPERATOR WALL MINE THE SITE IN SECTION ABOUT 20 -25 ACRES IN SIZE, <br />AS DEPICTED. <br />14. THE OPERATOR WALL CONSTRUCT PERIMETER BERMS AT THE BEGINNING OF <br />EACH RESPECTIVE MINING PHASE. THE BERMS SHALL BE SEEDED WITH THE <br />SPECIFIED SEED MIX IN THE FALL OR SPRING. <br />15. THE OPERATOR SHALL INSTALL IRRIGATION, TREES AND SHRUBS AS SOON AS <br />IT IS FEASIBLE AFTER THE BERMS HAVE BEEN CONSTRUCTED. PLANTING FOR <br />DECIDUOUS TREES SHALL OCCUR PRIOR TO OCTOBER 15TH AND AFTER MARCH <br />15TH. PLANTING FOR EVERGREEN TREES SHALL OCCUR PRIOR TO OCTOBER <br />1ST AND AFTER MARCH 15TH. <br />OVERBURDEN STORAGE <br />AREA = 6.7 AC. 24' ALLOWABLE <br />r- � � ACCESS <br />WEST LINE <br />SE1 /4, SEC.18 <br />APPROXIMATE CL LOCATION <br />OF PORTER SEEPAGE DITCH <br />LEGEND: <br />-�� <br />PERMIT BOUNDARY <br />- - - - <br />MINE EXCAVATION BOUNDARY <br />- <br />MINING PHASE LINES <br />{ <br />100 YR. FLOODPLAIN <br />- - <br />EXISTING WATER <br />- -4840- - <br />EXISTING 2' CONTOURS <br />QJ <br />EXISTING POWER POLE <br />E- <br />EXISTING OVERHEAD <br />POWER <br />G- <br />EXISTING GAS LINE <br />GAS MARKER <br />® <br />PETROLEUM WELL <br />❑ <br />GAS /OIL EQUIPMENT <br />10 <br />TELEPHONE PEDESTAL <br />x <br />EXISTING FENCE <br />EXISTING TREE <br />REVISIONS <br />D <br />EXISTING STRUCTURES <br />OMINING <br />SEQUENCE <br />® <br />TOPSOIL BERM <br />® <br />OVERBURDEN STOCKPILE <br />pppnp <br />HAUL ROAD /CONVEYOR <br />PROPOSED ACCESS <br />APPROXIMATE LOCATION <br />O <br />OF GROUNDWATER RECHARGE <br />WELLS <br />NAME CHANGE PER DMG <br />DRAINAGE SWALE <br />North <br />0 150' 300' 600' <br />SCALE: 1" =300' <br />NO AO <br />11� <br />PERMIT R r ■� <br />EAST USE BOUNDAJ <br />TEL \ <br />S1/16 COR., `SE1 /4, SEC. 18 15 TELCO \"`■■■ ■ <br />SEC. 18 / EASEMENTS ■ ■ <br />PROPOSED EASEMENT <br />/ TEMPORARY <br />BERM O <br />1 9 <br />AREA = 20.7AC. <br />1 <br />l <br />1:1 TYP.) <br />MINING <br />HIGH WALL <br />AREA = 13.8 AC. <br />O <br />AREA = 18.1 AC. <br />25' <br />I- SETBACK <br />DISCHARGE 4 PIPES T61 <br />DI <br />DI RIVER DISCHARGE <br />NA HISTORIC WATER N TO <br />DRAINAGE SILT PONDS <br />EASEMENT <br />WALL <br />SETBACK <br />1:1 TYR) <br />MINI G <br />HIGH WALL <br />APPROXIMATE U APPNUMMATE CL LOCATION <br />LOCATION OF f� � OF THE McCANNE DITCH <br />RECHARGE WELL LJ �---�� <br />FULTON DITCH D <br />E1 /4 COR., LATERAL O <br />SE CDR., PROPOSED �� ROW SEC.19 <br />SEC.18 120' ROW TEMPORARY BERM <br />_E___ E E E -E E E E ... <br />MINING <br />HIGH WALL <br />[70' SETBACK I / pppGnnnpppGnnpp np=3mmrm Y <br />PROPOSED SEC. LINE 30' GASIJNE / / 70' SETBACK 40' SETBACK °�aa 1 <br />100' ROW SETBACK SEC. UNE ( PROPERTY UNE \OD <br />o PREMIER ��O <br />/ ASPHALT BATCH PLANT it <br />AREA = 4.7 AC. DRAINAGE SWALE ELECTRIC <br />gTBACK NE I FOR PROCESSING 1 9 EASEMENT <br />AREA = 18.7 AC. I AREA = 17.7 AC. / / I i " AREA = 21.4 AC. 337 E"CHI0 <br />25' <br />CONVEYOR I I 15 l i PROPOSED ACIC D <br />CROSSING I 100' ROW <br />L I AREA = 16.8 AC. i 11 d <br />�pppnDpnpnpnpnppnpnpnpppnppp0 l}7 ppnpnpnpnppppppnpp 7CONVEYO npnpnpnpnp p n p pp p� n p n p n p n p pp n p n p n p p p n p M=1 <br />I <br />1:1 (TYP.) <br />I 1 MINING PROCESSING AREA AND 18' HIGH <br />I. I HIGH WALL I 0% i CONCRETE AND ASPHALT c� <br />HAUL RO I BATCH PLANTS CROSSING i <br />MINING <br />25' I GAS WELL I 1 8 HIGH WALL I <br />SETBACK AREA = 23 2 AC / <br />ROW <br />EOA <br />RO <br />WALL <br />W <br />110' GAS WELL <br />SETBACK �p <br />i <br />4 PIPES TO I TEMPORARY BERM <br />DISCHARGE EXISTING <br />10 12 <br />AREA = 18.5 AC. I AREA = 19.b AU. <br />LS1 /4 COR., <br />SECAB <br />I <br />i <br />i <br />I <br />I <br />i <br />TEMPORARY TOPSOIL <br />STOCKPILE (MATERIAL <br />TO BE USED TO RECLAIM <br />25 -55' SLOPES AS CONCURRENT <br />RECLAMATION IS COMPLETED) <br />10 -0' <br />SETBACK <br />- - EXISTING GRADE <br />GRIXIND)WATER _ - - - - - - - <br />- ...._.- .t.._....� <br />TAEIIE ...�...� 1 <br />DEWATERING \'•- ` <br />TRENCH <br />POSITIVE <br />DRAINAGE TO BOTTOM OF <br />TO SUMP GRAVEL RESERVE <br />TYPICAL - TOPSOIL STOCKPILE AT EDGE OF MINING AREAS CROSS SECTION <br />NOT TO SCALE <br />WATER TO <br />SILT PONDS <br />14 16 <br />4REA = 14.4 AC. I AREA = 14.0 AC. <br />25' - <br />SETBACK <br />' r• n <br />1 - <br />7 <br />I <br />i <br />i <br />3 MIN 1 <br />1� <br />EXISTING GRADE <br />VARIES <br />SEED WITH SPECIFIED NATIVE <br />GRASS MIX AND do WATER TO <br />ESTABUSH <br />3 MIN <br />7< <br />TYPICAL - TEMPORARY MINING BERM CROSS SECTION <br />NOT TO SCALE <br />CONCEPTUAL PLAN <br />GAS WELL <br />i I <br />RAW <br />MATERIALS <br />IN <br />�. rt•e0�' 0 I -� <br />1 <br />1 •• 1 <br />I <br />I _ <br />� � v <br />I <br />L <br />PROCESSING PLANT AREA DETAII <br />NOTE: NOT TO SCALE <br />APPROXMATE <br />LOCATION OF <br />RECHARGE <br />WELL <br />■ <br />■ <br />100' ROW <br />' <br />CIVIL RESOURCES, LLC. IS NOT RESPONSIBLE FOR SAFETY, IN, ON, OR ABOUT THE <br />PROJECT SITE, NOR FOR COMPLIANCE BY <br />THE APPROPRIATE PARTY OF ANY <br />REGULATIONS THERETO. <br />THESE MAPS WERE PREPARED BY CIVIL RESOURCES, LLC. IN COOPERATION WITH SW <br />TKO <br />{ <br />JOINT VENTURE PARTNERSHIP, LLC. SW TKO JOINT VENTURE PARTNERSHIP, LLC. <br />WILL KEEP THE DIVISION OF <br />MINERALS AND GEOLOGY INFORMED OF ANY CHANGES <br />TO THE MINING OR RECLAMATION PLANS THROUGH ANNUAL REPORTS AND FILE <br />TECHNICAL REVISIONS AND AMENDMENT APPLICATIONS AS NECESSARY THROUGHOUT <br />THE LIFE F <br />THE MINE. <br />DANNA ORTIZ <br />DATE <br />CIVIL RESOURCES, LLC. <br />LUPTON LAKES RESOURCE, <br />FT. LUPTON SPECIAL USE PERMIT AND <br />MLRB 112 RECLAMATION PERMIT M- 2004 -078 <br />REVISIONS <br />MINING PLAN <br />N0. <br />DESCRIPTION <br />DATE <br />BY <br />SW TKO JOINT VENTURE PARTNERSHIP, LLC <br />1 <br />REVISIONS PER <br />SW TKO <br />11/9/04 <br />AR <br />2 <br />-37- <br />NAME CHANGE PER DMG <br />12/20/04 <br />CIVIL R E SOURCES, LLC P.O Oak Street, Suite k, <br />P.O. Box 680 Frederick, CO 80530 <br />PERMIT NO. CHANGED <br />1/27/05 <br />OF <br />OF <br />4 <br />PROCESSING AREA MOVED <br />1/27/05 <br />OF <br />303 833 1416 (p) 303 833 2850 (f) <br />DESIGNED BY: DO JOB NO. DWG: <br />DRAWN BY: ARR/SR DATE: SEPT. 2004 DMG - Revised for Adequacy Response 3 -25 -05 <br />5 <br />Ff CLIFTON SPECIAL USE <br />/24/05 <br />SR <br />6 I <br />DMG ADEQUACY RESPONSE <br />/28/05 <br />KF <br />CHECKED BY: DO SCALE: AS NOTED SHEET: O <br />/ <br />Permit #: Aq _ 1 0 0 LI - (J 7 8 Confidental?: ,4) <br />Class Type -Seq.: RECFIVED <br />From: v, z- w i To: G <br />Doc. Name: _3 4 ;7 , / << - � - <br />Doc. Date (If nodaate stamp): .-f - 3 W C' g- <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.