My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42872
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42872
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:18 PM
Creation date
11/20/2007 11:21:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Permit File
Doc Date
5/2/1995
Doc Name
ADEQUACY REVIEW RESPONSE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gold bill Mill AAagyta a R Mar 2 1995 <br />I5 'Rte Mine Safety end Health Administrebon (MSHAl inapedor indicated cerbelly after the inspection that <br />everything was sabsCectory et the site and did not issue any citations. The report was sent [o CMLRB and <br />not to the Gold Hill troll or COM, Inc. A copy of the fepef[ was requested tiom the Division after the <br />ahortoorrurtga were tnantianed by the Aviaton inspeeton. <br />The shortcomings ere bated below with otu rcsporues <br />a) "Diversion ditchq above the tailings tmpowdment arc not very well mairtramed and should <br />be upgraded." <br />The diversion ditches have been cleaned and deepened to safety pass a design stomt. <br />h) "Decant pipes not capable of safely passing the quantity of wars during a design storm." <br />The water ponding portion of the tailings pond was supprnedly designed to contain a design <br />storm end the decant ftttee weR trutalled to remove the design storm warn over a period of <br />severeldays. <br />e) "Recommended that the crest of the embertlanent should be widened and the oublope <br />4euated." <br />The errtbanl~nant crest and dam outelope were approved by CMLRB end the stutter dam was <br />built in eocordnnce with specifications. CDM, Inc. a currrntly reviewing the specitieatioru but <br />cannot give an opvtion on the stability tsntil a complete evtiluanon a made. ilia pond appears <br />to be stable vt its parent configurnaon end the dam crest appears m be wide enough <br />17. 'Ilia Gold Hill Mill does not see a compelling reason to fence the entire mill complex. There is currrntly a <br />fence around the lailirtga urtpoundmctt and this (rnce will be maintained attd upgraded during the Life ot'the <br />operation until the tailings area is rtxdanrted. <br />I8. 7lte tailings dam, es presently configured. u the original starter dam without any raises. The starter dent was <br />not built by the upstream method. <br />19 The starter dam (dike) was built from matmel that wee takrn from the retention pond area upstream Crom <br />the dam. Drawings recrndy obtained by the Ihvisian (April 24, 199 @orn Mark Steen show the <br />configuration of the starter dam end borrow azea. The "as•built" drawings show a dam crest that is to to 12- <br />feet iri width with a downstream slope of approximately 1.5:1. Height of rite embankment is hard to <br />determine bemuse the drawings and seeti0rie do not show original ground or contottn, however, rough <br />measurement on the section indicate en emberdattent that is 4 to 8 feet in hagtst at centerline, <br />20. The origvtal plans ter the tsilirtgs impoundment inchrdexl a seepage wUection system that would pipe the <br />seepage to the Hazel A edit Just prior to consbttction, the Division requested that a synthetic later be <br />instaIled. The liner does not allow any seepage through the dam and, therefore, no seepage eo>leenon was <br />installed. Decant lines currently collect excess water tram storm runoff within the tailings retention pond <br />area end direct them through a pipeline to the Hazel A edit. Decant water is then recycled Gom the Hazel A <br />beck to the mill <br />? 1. COM, Inc. plants to use soda ash, pine oil, end xanttiate Cor mill proe:ssing. If any other chemicals are <br />required in the milling process, a technical revision, if required by the D.M G, will be filed with the <br />Division. The chemicals are niriendy bought m bulk and the following mnXimrtm ~rutnntties wilt tx stared <br />at the miR: <br />Soda Ash 50,000 pounds <br />Pine Od 2,000 gallons <br />~Canthate 2.000 galons <br />
The URL can be used to link to this page
Your browser does not support the video tag.