Laserfiche WebLink
(Note. p~uchese J63 yards of topsoil in addition to the 131 yard from topsoil stockpile <br />on site) <br />Water Semolinst • Four quarters o[sampling includutg labor SUB-Tt7I'AL 51,300 <br />Remove Left Hand Crack PjQeline - 16 man hours et T33lhour St1B-TOTAL 5360 <br />Remove Decant Pipeline - 4 man hours at S33/hvw SUB-TOTAL S l40 <br />Remove Frnu, round T~ - l2 mnn bouts al T33ihau SU8-TCYiAL 5360 <br />Grout Decant Line - 2 man hours et f33/hour S"70 <br />Concrea grout • 2 sacks at f9.OQ'seck ~1 <br /> 5IJB-TC7TAL f88 <br />ltutall t7eotextile Over Teilirfga • 32 men hoots at E33/lrow SUB-TOTAL T1,120 <br />Cement C;rottnd Wa[c Monitautg WeIL Shut • 2 tveJla at 60.Ceet deep x B-in. <br />dumetar (42 w tt) x 54.30/2cy sack S96 <br />Labor - 6 roan faun at S331hour ~, jQ <br /> SUB-TOTAL S30b <br />GRAND TOTAL g2B.9I1 <br />