Laserfiche WebLink
u <br />• <br />PERMIT CHRONOLOGY <br />(Current through 6103). <br />Filing, ~ Description <br />Submittal or <br />Issuance <br />Date <br />Technical Revisions <br />2!70/93 TR-12 - Application b SMC for East Yard coo! reclaim s stem (withdrawn 4/16/93) <br />2/26/93 TR-13 -Application by SMC addressing reclamation bond calculations 16/11/93 <br /> decision) <br />4/20/93 TR-14 - Ap lication by SMC for SAE demonstrations (10/12/93 decision) <br />4/23/93 7R-15 -Application by SMC addressing NPDES discharge requirements and C-Seam <br /> sum (3/3/94 decision) - <br />4/28/93 TR-16 -Application by SMC for second mine ventilation tan for Sanborn Creek Mine <br /> 151]7/93 decision) <br />8/3/93 TR-17 -Application by SMC addressing permit renewal responses and hydrologic <br /> monitoring 1514/94 decision) <br />8!16/93 TR-78 - Application b SMC for reduction in h drolo is monitorin (17/10!93 decision) <br />9120193 TR-19 - Application b SMC for temporary coal refuse ile 111/22193 decision) <br />4/4/94 TR-20 -Application by SMC for reduction in hydrologic monitoring (5/5/94 decision) <br />4/28/94 TR-21 -Application by SMC for East Yard coal reclaim system and access road 19/1/94 <br /> decision! <br />5/24/94 TR-22 - Application b SMC for Substation No.3 17/11!94 decision) <br />11/10/94 TR-23 - Application b SMC for Bear Creek reclamation (7/26195 decision) <br />11/1 7/94 TR-24 -Application by SMC for mine plan revisions and production increase to 1.3 <br /> million tons per year 12/17/95 decision) <br />3/16/95 TR-25 -Application by SMC for new ventilation intake decline for Sanborn Creek Mine <br /> 6/19/95 decision) <br />4/11/95 TR-26 - A plication b PBR for East Yard Sedimentation Pond (4/4196 decision) <br /> TR-27 -Application withdrawn <br />4/1/97 TR-28 -Application by OCM for reclamation o1 roads and powerlines (4/1/97 decision) <br />3/5/97 TR-29 -Application by OCM for phased expansion of mining operations to 4.0 million <br /> tons per year !includes installation of longwall in Sanborn Creek Mine and surface <br /> facilit motlifications, 7/15/97 decision! <br />4/23/97 TR-30 -Application by OCM to eliminate woody stem density requirements 19/5/97 <br /> decision) <br />10/1/97 TR-31 -Application by OCM to incorporate longwall subsidence evaluation for Sanborn <br /> Creek Mine 14/30/99 decision) <br />11/3/98 TR-32 -Application by OMI for construction of surface facilities and initial development <br /> of Elk Creek Mine 18/25/991 <br />5/i 2/99 TR-33 -Application by OMI providing as-builts for temporary mine dewatering pond <br /> 7/20/99 decision) <br />5/26/99 TR-34 -Application by OMI submitting hydrologic monitoring data for emergency mine <br /> water dischar a (7/9(99 decision) <br />6!21/99 TR-35 -Application by OMI updating PHC evaluation for 2,000 gpm mine discharge <br /> 11/2/00 decision) <br />10/22/99 TR-36 -Application by OMI for reconstruction of Sedimentation Pond Al 11131/00 <br /> decision) <br />17/29/99 TR•37 -Incidental permit boundary revision for lease modification (1/14/00 decision) <br />3/16/01 TR38 -Application by OMI for coalbed methane wells CBM-6 thru CBM•11 and <br /> associated roads 13/28/01 decision) <br />8/19/02 TR39 -Application by OMLLC for expansion of upper Elk Creek Mine bench for rock <br /> dust tanks. 18/30/02 decision) <br />8/26/02 TR-40 -Application by OMLLC for modification to the reclamation plan. (10/29/02 <br /> decision! <br />8130/02 TR•41 -Application by OMLLC for additional degasification well CBM-15 and <br /> associated pad and road. l9/27/02 decision) <br />1/73/03 7R-42 -Application by OMLLC to increase annual production to 6MM tpy 12/3/03 <br /> decision) <br />11 W CRF <br />Revised June 2003 <br />