Laserfiche WebLink
• <br />1 <br /> <br />O'Connor <br />May 23, 1988 <br />Page 2 <br />Vegetation <br />Operations Plan <br />B 10 Revised Introduction, <br />revised Addendum 10-1, <br />revised Exhibit 10-3 <br />10,11 12 Revised Pages ix, 12-7 <br />through 12-15, 12-19 to <br />12-20, 12-23 to 12-24, 12-27 <br />to 12-29, 12-32 to 12-33, <br />12-36 to 12-37, 12-47 to <br />12-53a and new Appendix <br />12-7, revised Exhibits 12-1, <br />12-2, 12-9A <br />Postmine Land Use 12 13 Revised Pages 13-40a, <br />13-40b, 13-51b, 13-51c, <br />13-59a through 13-64, 13-70, <br />13-92, revised Appendix <br />13-6; revised Exhibit 13-2 <br />and new Exhibit 13-7 <br />• <br />Revision 13 15 Revised List of Revisions, <br />new Tab 14 <br />Archaeological clearance for this revision area is already <br />included in Volume 2, Tab 5, Appendix 5-3. <br />The addition of 26.7 additional acres of disturbance has <br />resulted in an increase in bond for the Seneca II Mine of <br />b252,733, which will bring the total bond to b6,728,501. <br />In addition to the above requested revision, please find as <br />new Attachment 12-7 (Volume 10, Tab 12) the certified <br />construction summary and as-built for the C-3 haul road as <br />shown on revised Exhibit 12-1. This road was previously <br />approved as shown on Exhibits 12-47 and 12-48. <br />Development of this technical revision is in direct <br />response to concerns of the State Land Board regarding <br />maximization of coal recovery from Coal Lease No. 475/13-5. <br />In order to implement this plan, it is necessary for <br />topsoil salvaging activities to commence about July 25, <br />1988. Therefore, Peabody is requesting that the Division <br />review this application as expeditiously as possible. <br />~J <br />