Laserfiche WebLink
i <br />i <br />i <br />i <br />~~ <br />i~ <br />i <br />Drill Pad and Access Corridor Reclamation <br />Regrading Drill Padlfopsoil Distribution <br />(471ocations, total 10.79 acres) <br />D-6 dozer (@$65/hr.) <br />8 hours location • $65/hr.' 47 locations <br />Subtotal - $24,440 <br />Regrading Access/Topsoil Distribution <br />51,400 feet(16.5 acres) of new access road (14' wide). <br />(16.5 acres / .04 acres/hr.) • $65/hr. <br />Subtotal - $26,813 <br />Total Regrading <br />Revegetation <br />$300/acre' 27.31 acres <br />~J <br />$51,253 <br />Total Revegetation $8,193 <br />Reclamation potential along 10 mi-es of seismic line <br />($1,500/mile) 516,500 <br />Equipment Mobilization and Demobilization <br />Mob/Demob $2,500 <br />Sub-Total $200,359 <br />25% Admin. $50,090 <br />t0%Contingeocy $25,045 <br />ESTIMATED RECLAMATION COST $275.494 <br />