anase 10 Reclamation (2024 - 20251 <br />Block 1 Gravel processing and storage area. <br />Block 2 Reclaim access road. <br />thru Totally Re-vegetate. <br />Block 8 <br />Block 9 Totally reclaimed <br />thru <br />Block 14 <br />Block 15 Reclaim access road. Re-vegetate. <br />and <br />Block 16 <br />Block 17 Fall 2024 -Start re-vegetation. Idle except for access road to mining, processing <br /> and stockpile areas. <br />Block 18 Distribute topsoil from Block 1 berms <br /> Fall 2025 -Start re-vegetation. <br />Block 19 Gravel extraction. Summer 2024 -Distribute topsoil to Block 17 and 18. <br /> Remove overburden to re-shape Block 18. <br /> Fall 2025 -Start re-vegetation. <br />Block 20 Summer 2025 -Remove topsoil to berms in Block 1. Remove overburden to re- <br /> shape Block 19 <br /> Gravel extraction. <br />Block 21 Remove topsoil to Block 19. <br />Block 22 Unaffected. <br />Phase 11 Reclamation 2026 - 2027 <br />Block 1 Gravel processing and storage area. <br />Block 2 Totally reclaimed. <br />thru <br />Block 16 <br />Block 17 Re-vegetated except for access road to mining, processing and stockpile areas. <br />Block 18 Re-vegetated except for access road to Block 19 and 20. <br />Block 19 Fall 2026 -Return topsoil to Block 20, reclaim access road and totally re- <br /> vegetate. <br />Block 20 Fall 2027 -Distribute topsoil, and totally re-vegetate. <br />Block 21 Summer 2026 -Gravel extraction. Remove overburden to re-shape Block 20. <br /> Fail 2026 -Distribute topsoil from berms on Block 1 and Block 22. <br />Block 22 Fall 2026 -Remove topsoil to Block 20. Remove overburden to re-shape Block <br /> 21. Gravel extraction. <br /> Fall 2027 -Return and distribute topsoil from berms on Block 1. <br />6 <br />