Laserfiche WebLink
I'R 93-IIJ I%,~lU UIi1VATBRl~1'G hACILITI' - amtinucd <br />tihaFt :\handonment <br />Cement I'lu, <br />~ ~ :~ ,I'n `..f i, - o . .. i~,- n Pre i...._i. u• v~ nn <br />_. ._,. i_ ~ iiCi sacn - u one > ~J ,nnan„^ _ _.vv <br />.ti UI'gCl Plllg <br />I ,420 cl~s/3cf per sack = 474 sacks (~ $6/sack = $ 2,844.00 <br />1 hrs of a drill rig, watertruck, Flatbed truck, pickup <br />truck, and dozer (~ $315.24/hr = S 2,522A(1 <br />recto plug = $ 5.00 <br />marker _ $ x.00 <br />Subtotal = $ 5,445.00 <br />IZevegetation: Assume cos[ for seed, disking, harrowing, contour <br />Furrowing, and fertilization ~ $259.19/acre <br />30% failure rate, including seeding and fertilization, <br />(~~ $122.39/acre <br />(3.55 ac z $259.19 = $920.12) + (.71 ac x $122.39 = $86.90) _ $ 1,007.02 <br />Borehole Site Subtotal = $ 27,323.88 <br />B. l~realntent Pond Site <br />\Nork Required <br />Regrade 2 ponds <br />Replace topsoil <br />Regrade road <br />• Remove building <br />Ponta Removal <br />Backfill/Regrade = 11,385.8 CY <br />Use DSH Dozer <br />11,385.8 LCY n 101.78 LCY/hr = 111.8G hrs. <br />1 11.86 hrs ~ $62.60/hr = $ 7,002.42 <br />topsoil Replacement -Pond <br />6,443.8 LCY <br />Use DSIi dozer <br />6,443.3 LCY r~i 57.16 LCY/hr = 112.73 hrs. <br />112.73 hrs s $62.60 = $ 7,056.47 <br />Topsoil Replacement -Access Road into Pond <br />927.5 LCY <br />927.5 LCY a 180.73 LCY/hr = 5.12 hrs <br />5.13 hrs x $62.60/hr = $ 32856 <br />Topsoil Subtotal = $ 14,387.45 <br />Rip Road <br />23 acres ~ 2 feet deep = 742 BCY <br />742 BCY ~ 1,128.39 BCY/hr = 66 hrs. <br />G6 ~ $65.88/hr = $ 43.33 <br />• <br />M R 97- I S4 66(a) 10/2/97 <br />