Laserfiche WebLink
~iR')5-121 IiA"I'CH W GIGH FILL UTILIZATION -COUNTY ROAD 27 <br />. <br />.~ dcuiiled csiim:uc nl additional reclanuttion costs for the proposed operations is ptesented bcloty. Estimated <br />costs h;ivc hero picpared wing previouslq presented and approved assumptions (oi equipment, production rate. <br />cquipmcm eu,ls. rental rates, manpower cases, etc. <br />I. Earthwork Voluntcs <br />;1. Haul/Place Replacement Spoil (maximum) = 13,00 BCY 1~.~2~ LC)' <br />II. F.guionum Requirements <br />~\ Caterpillar 637E Scraper <br />III. Geniipntent Production Rates <br />i\. I taut/Place Spoil ~ 260 LCY/hr <br />Time Rcyuired: 15,525 LCY % 260 LCY/hr = 60 hours <br />IV. EuuipmcntHourlvCosts <br />A. C'at 637E Scraper <br />~i0 hrs n $201/hr = $12.060.00 <br />Total EquipmentCosts = $12,060.00 <br />VII. "total Costs <br />I . Total Equipment Costs = $12,(160.00 <br />Subtotal = $ 12A60.00 <br />• Adittin Fee (17 %) _ $ 2.050.00 <br />MR-124 Batch Weigh Fill Utilization - CR 27 Total Reclamation Bond Costs = $ 14,110.00 <br />u <br />M R 97- 154 57 10/2/97 <br />