Laserfiche WebLink
l'I~:CFINICAL ItI~:VItiION 9>-21: \VAti"p l? PILE (continued) <br />• VI Uihci (~+as <br />:\ Rrvc_ctation: Assume cost for seed, disking, harrowing, planing. shnd+s. <br />amrtnir fu rro~.•ing, a tractor, and 2 operators, for a cost per acre of $219. <br />l"o[al Revegetation Coss = I R acres rr $219/oc = $ 3,7G2.U11 <br />li Drainaue PG-Z Restoration <br />Culverts removal - (General Labor 16 hr n $ I ~/hr) _ $ 240.00 <br />Cuh~crts removal with backhoe - (I6 hr @ $75/hr) _ $ 1,200.00 <br />VII. l ~flal Costs <br />I. Total EquipmentCos[s $141.126.00 <br />3. dotal Other Costs = $ 5.202.00 <br />Subtotal = $14G,32S.(10 <br />AdminFee( 17%) _ $ 24,876.00 <br />TR-21 Waste Pile Total Bond Estimate = $171,204.00 <br />• <br /> <br />s <br />M R 97- I ~4 54(a) 10/2/97 <br />