Laserfiche WebLink
199 MO\I~fOIt ~VI?LL - MIt9S-1 I3 <br />• i\ Seal Ilulr <br />I. Drill Rig - ~~rout hole <br />$ 12.5,ihr. .e 4 his. <br />2. Wa[er Truck -water for cement <br />$37A2/hr. s 4hrs. <br />3. flatbed "truck -Material/suppl~• hauling <br />$35.07/hr. z 4hrs. <br />4. Cemen[ <br />$9.00/sack x 40 sacks <br />5. Install Marker <br />$2.00/each ~ I marker <br />13. Ibusoil Replacement -Use 14 G Grader <br />I. Pad <br />100' ~ 50' = 5,000 ft2 = 0.1 ac <br />I hr. ~ $136.93/hr. <br />• (.. 5l'ed In L' <br />0.1 acres s $201.25/ac <br />Seal <br />Topsoil Replacement <br />Seeding <br />• <br />Subtotal <br />Subtotal <br />Subtotal <br />17.37% Admin <br />To[al <br />Say <br />_ $ 5(10.011 <br />_ $ IdS00 <br />_ $ Id0.00 <br />_ $ 360.00 <br />_ $ x.00 <br />_ $ 1,150.00 <br />_ $ I4.oo <br />_ $ 14.00 <br />$ ? 1.00 <br />$ 1,150.00 <br />$ 14.00 <br />$ ? 1.00 <br />_ $ 1,135.00 <br />_ $ 206.00 <br />_ $ 1,391.00 <br />_ $ 1,400.00 <br /> <br />MR 97-154 50 10/2/97 <br />