Laserfiche WebLink
1111N1)It Itl:\~Itil/)N 93-93 <br />Inllucm lirucwr~ Building <br />i\ Itcmoval <br />assume building IGs 12's 9 - 172:3 CF x$(1.17/CF <br />I-beam Frame 56 LF ~ $0.17/LF <br />13cnt Revetment <br />I i. Itcmova I/Disposal <br />Concrete will be buried at highwall brtse during final grading. <br />Assume x concrete footers I l s l I' x 2' <br />Assume 4 concrete piers 2' z 2' x x' <br />_ $ 293.76 <br />_ $ 9.i2 <br />Remuval Footers 41 LF ~ $14. I y~LF x 4 footers = $ 3,327. I <br />Piers I6 LF x $14.19/L.F _ $ 227.Ox <br />Disposal I I x l l x 2 x x= 36 CY x $5.06/CY = $ 132.1 G <br />2.2 ~; a . a = 2.a c\• . $s.o~/cv = $ 12. I a <br />Assume steel boy/building 25~ ~ 25' ~ $j' <br />25 x 25 x 55 = 34,375 CF x $0.17/CF=$5,8x3.75 <br />• <br /> <br />Subtotal = $ 8,895.53 <br />18% Admin = $ LG0120 <br />Total = $IU,a96.73 <br />Say = $10,500.00 <br />MR 97-15x 38 10/2/97 <br />